JSERC · Jharkhand State Electricity Regulatory Commission
Modalities of Tariff Determination Regulations, 2023
Jharkhand State Electricity Regulatory Commission (Modalities of Tariff Determination), Regulations, 2023
RegulationDated 24 Apr 2023Published in the Gazette 3 May 2023Notification No.90 dated 24th April, 2023
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is JSERC's framework regulation deciding *how* tariffs are to be determined in Jharkhand, not the tariffs themselves. It is a short, structure-focused instrument of 14 regulations issued by notification dated 24 April 2023 and published in the Jharkhand Gazette Extraordinary on 3 May 2023, from which date it comes into force (p1).
Regulation 1 gives the title, territorial extent and commencement; Regulation 2 defines the working vocabulary — Developer, Existing and Ongoing Project, Regulated Tariff Mechanism (RTM), STU Transmission Plan, Tariff Based Competitive Bidding (TBCB), Threshold Limit and User — and routes all proceedings under the regulation to the JSERC (Conduct of Business) Regulations, 2016 (p2).
Chapter I (Generation, pp3–4) draws the line between cost-plus and bidding. Regulation 3 continues existing Section 62 projects under RTM for the remainder of their PPA or plant life, extends RTM to expansion of state-owned plants, waste-to-energy plants, repowering, replacement and new stations — each in practice tied to the quantum covered by a Commission-approved PPA. Regulation 4 sends everything not covered by Regulation 3 to Section 63 competitive bidding, with prior Commission approval of the capacity to be bid.
Chapter II (Transmission, pp3–5) requires the STU to file an updated five-year rolling transmission plan, with scope, cost and COD, for Commission approval by 28 February each year; only projects in that approved plan may be implemented. New greenfield intra-State transmission projects above the threshold of Rs. 175 Cr. must go to TBCB (Regulation 6); everything else, plus augmentation and strengthening works, stays under Section 62 read with the 2020 Transmission Tariff Regulations (Regulation 7).
Chapter III (p4) leaves retail tariffs to Section 62 read with the 2020 Distribution Tariff Regulations. Chapter IV (pp4–5) protects existing and ongoing projects' current mode of tariff determination and reserves to the Commission inherent powers, power to relax, to remove difficulties, to amend, and final interpretation.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.