MERC · Maharashtra Electricity Regulatory Commission
Specific Conditions of Distribution Licence for Nidar Utilities Panvel LLP, Multi-Services SEZ Panvel, 2017
Maharashtra Electricity Regulatory Commission (Specific Conditions of Distribution Licence applicable to Nidar Utilities Panvel LLP for Multi-Services SEZ at Panvel, District Raigad, Maharashtra) Regulations, 2017
RegulationDate not statedNo. MERC/TEC/ Licence Conditions/NUP/2017/02063
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are MERC's licensee-specific distribution regulations for the Multi-Services SEZ at Panvel, Raigad, issued under the Electricity Act 2003 and published in the Official Gazette (p5). They replace M/s. Ixora Constructions Pvt. Ltd. with Nidar Utilities Panvel LLP (NUP) as the deemed distribution licensee for that SEZ, and the 2014 Ixora Regulations stand repealed from the date these Regulations are published (p5).
Regulation 1 gives the title, ties the extent to the SEZ area notified by the Government of India in S.O. 514(E), and makes commencement conditional on Gazette publication (p5). Regulation 2 defines the working vocabulary — Act, Co-Developer, Developer, Deemed Distribution Licensee, General Conditions, NUP and Multi-Services SEZ — and refers undefined terms back to the Electricity Act 2003, the SEZ Act 2005 and rules thereunder (p5–6).
Regulation 3 deems these Specific Conditions plus MERC's 2006 General Conditions of Distribution Licence to be NUP's Conditions of Licence, governing its distribution and retail supply operations (p6). Regulation 4 fixes the area of supply by reference to the SEZ notification and a map deposited with the Commission, and describes the area as 139.83 Hectares across villages in Khalapur and Panvel Talukas (p6). Regulation 5 sets a 25-year licence term running from 19 February 2009, or until revocation, whichever is earlier (p6). Regulations 6 to 9 require public inspection of the licence, mandate 24-hour uninterrupted supply, and reserve to the Commission powers to amend the Regulations and to remove difficulties by order (p6). The Schedule at p7 holds the area-of-supply map.
Read with this
Commencement notices and reasons
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.