Deviation Settlement Mechanism and Related Matters Regulations, 2026 — Draft

Tamil Nadu Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2026

Draft regulationDated 29 May 2026TNERC/DSM&RM/22 …… dated 29-05-2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is TNERC's draft replacement for its deviation settlement framework, published as Draft Notification No. TNERC/DSM&RM/22 dated 29-05-2026 with comments invited by 13-06-2026 and objections to be sent to the Secretary at Guindy, Chennai (p1). The Commission says it will take the draft up after fifteen days from publication on the TNERC website; the regulations would commence on Tamil Nadu Government Gazette publication, or a later date the Commission specifies within sixty days of it (p1).

The draft swaps the 2019 mechanism for a market-linked one. Regulation 2 states the objective — commercial enforcement of schedules for generators other than wind, solar and hybrid, and for buyers on the intra-State transmission and distribution systems (p2). Regulation 3 defines the working vocabulary: the 49.90–50.05 Hz 'f band', the market segments (I-DAM, HP-DAM, RTM), the seller-side Reference Charge Rate and buyer-side Normal Rate, 'State Entity', 'Gaming' and the State Deviation Pool Account (p2–6). Regulation 4 fixes who is covered — conventional generators, private and State hydro not tied to irrigation or drinking water, storage systems and all buyers — and who is not: wind, solar, hybrid and wind/solar-plus-storage plants, State-owned hydro linked to irrigation and drinking-water schemes, and State-owned storage; partial open access consumers wait for a later notified date (p6–7). Until then their over- and under-drawal is settled bilaterally and reflected in the distribution licensee's deviation (p8–9).

Operating backbone: Regulation 5 requires schedule adherence and restricts intentional deviation; Regulation 6 sets SLDC and State Entity duties (contract reporting, connection/open access agreements, GPS-synchronised 15-minute interface metering, binding despatch instructions, publication); Regulation 7 covers monthly energy accounting by the State Power Committee, weekly deviation statements and an SLDC accounting procedure to be cleared by the Commission (p7–9). Regulation 8 defines the Normal Rate as the highest of three market-based formulations with a fallback when prices are missing; Regulation 9 gives the deviation formulae; Regulation 10 routes capacity declaration and scheduling to the TNERC Grid Code (p10–11).

Pricing and limits: Regulation 11 sets out general charging rules — storage treated as a seller with reversed signs in charging mode, a six-time-block sign rule, infirm power, start-up power, HP-DAM deviations, and zero charges during grid disturbance or force majeure — and then the frequency-linked price tables for generating stations, run-of-river stations and buyers (p11–19). Regulation 12 sets volume limits per category, a daily deviation limit, the sign-change obligation and 20% add-ons for breach (p19–21).

Enforcement and money: Regulation 13 (gaming inquiries and penal charges), Regulation 14 (binding SLDC instructions), Regulation 15 (State Deviation Pool Account and its order of appropriation), Regulation 16 (payment within ten days, interest on delay, letter of credit and encashment), Regulation 17 (State Power Committee), Regulations 18–21 (amendment, difficulty, relaxation, directions) and Regulation 22 (repeal of the 2019 Regulations and 2024 Amendment Regulations with savings) occupy pages 21–27. Annexure I gives the seller price vector step by step and Annexure II the buyer vector, each with a worked example (p28–32). The Statement of Reasons at pages 33–39 explains the alignment with the CERC DSM Regulations, 2024, why frequency-linked signals are retained for a renewable-rich state, the exclusions, and the tightened gaming and payment-security provisions.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Scheduling and despatch

Read with this

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗