WBERC · West Bengal Electricity Regulatory Commission
Consumer Grievance Redressal Forum and Ombudsman (First Amendment) Regulations, 2020 — Statement of Reasons
West Bengal Electricity Regulatory Commission (Guidelines for Establishment of Forum for Redressal of Grievances of Consumers and Time and Manner of Dealing with such Grievances by the Ombudsman) (First Amendment), Regulations, 2020
Statement of reasonsDate not stated
The commission's reasons for the Consumer Grievance Redressal Forum and Ombudsman Regulations, 2013 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Statement of Reasons (SoR) the West Bengal Electricity Regulatory Commission prepared for the First Amendment, 2020 to its 2013 regulations on consumer Grievance Redressal Forums and the Ombudsman. It is a consultation record rather than the amending instrument: for each provision it prints the text proposed in the draft First Amendment 2019, the comments received, its own analysis, and the wording finally adopted in 2020 (p1–2).
Sections 1–3 set the background. The draft was hosted on the Commission's website and publicised in five newspapers, with comments due 15.01.2020; two stakeholders responded — CESC Limited and the All Bengal Electricity Consumers' Association (ABECA) — and the Commission explains its treatment of each point before finalising the amendment for notification in the Kolkata Gazette Extraordinary (p1–2).
From Section 4 the document works through the amendment provision by provision: short title, commencement and interpretation, with the year in the title changed from 2019 to 2020 because notification slipped (p2–3); the definition of 'consumer grievance or complaint', retained against CESC's objection to the word 'quality' (p3–4); the Ombudsman's establishment, continuance and removal (p4–5, p8–9); how many Ombudsmen may be appointed and their territorial jurisdiction, with ABECA's district-wise proposal rejected (p5–6); appointment by open advertisement and stop-gap additional-charge arrangements (p6); qualifications and desirable experience (p7); tenure (p7); conditions of service, remuneration and office arrangements (p9–11); the Ombudsman's monthly, half-yearly and annual reporting duties (p11–12); and the procedure for filing, hearing and disposing of representations, including a new power to condone late filing drawn from the Limitation Act (p12–16). Annexure-II sets out the monthly reporting format (p16–17).
Read with this
The regulation
- Dated 26 Aug 2013Consumer Grievance Redressal Forum and Ombudsman Regulations, 2013
Amendments and corrections
Earlier drafts
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.