MPERC · Madhya Pradesh Electricity Regulatory Commission
Methods and Principles for Fixation of Charges including Miscellaneous Charges recoverable by Distribution Licensee, 2006
Madhya Pradesh Electricity Regulatory Commission (Methods and principles for fixation of charges including miscellaneous charges recoverable by distribution licensee for supply of Electricity) Regulations 2006 (RG-22 of 2006)
RegulationDated 25 Feb 2006No.579/MPERC/2006
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MPERC's principal regulation of 2006 laying down the methods and principles by which the Commission fixes charges — and miscellaneous charges — recoverable by distribution licensees for supplying electricity in Madhya Pradesh. It is made under s.45 read with s.181 of the Electricity Act 2003 (p2), and applies to all distribution licensees including deemed licensees in the State, and to consumers receiving supply under proviso 1 of s.43(2) (p2). It takes effect from Gazette publication, but the Gazette date is not printed (p2).
Section 1 states the title, extent and commencement (p2); Section 2 defines the Act, the Commission, distribution licensee, the EHT/HT/LT consumer voltage bands, the MP Vidyut Sudhar Adhiniyam 2000 and authorised load (p2–3). Section 3 sets the general principles: charges should reflect efficient cost of supply, delivery (wheeling) and consumer care, with system losses across EHT, HT and LT areas considered (p3). It then enumerates the charge heads a licensee may recover — fixed/network charges, energy charges, meter or plant rent, and miscellaneous charges under ss.46–47 — and gives an illustrative list of services that can attract a fee, from meter testing and new connections to shifting, resealing and re-rating, with an explanation on proportionate transformer and substation cost recovery above stated load thresholds (p3–4). Miscellaneous charges require the Commission's prior approval on grounds of reasonableness and actual cost (p4).
Section 4.1 fixes how authorised load is derived for domestic and non-domestic LT consumers from monthly consumption, and confirms sanctioned/connected load for other LT consumers (p4). The remaining clauses require six-monthly publication of revenue and collection data by division and category in January and July, with website posting (p5); allow the Commission to specify tariff categories, surcharges and a consumer tariff card under s.62 (p5); provide for demand-based tariff and the metering threshold at which kVA demand recording may be required (p5); allow power-factor, load-factor and DSM rebates and licensee incentives or penalties tied to performance standards (p5); and permit minimum charges (p5). Clause 1.14 gives a difficulty-removal power (p6); Section 7 allows amendment with prior publicity and requires review and re-notification every three years (p6); Section 8 supersedes the 2005 regulation of the same subject and preserves the Commission's inherent and residual powers (p6).
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.