MSERC · Meghalaya State Electricity Regulatory Commission

Facilitation of Telecommunication Network Regulations 2022 — Draft

Meghalaya State Electricity Regulatory Commission (Facilitation of Telecommunication Network) Regulations 2022.

Draft regulationDated 17 Oct 2022MSERC/FoTN/Regulation/2022/154 dated 17th October 2022

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Meghalaya State Electricity Regulatory Commission issued these regulations under section 51 read with section 181(o) and (y) of the Electricity Act 2003 to allow distribution licensees and franchisees in Meghalaya to rent distribution assets — poles, distribution transformers and official buildings, but not wires — to telecom companies for installing telecommunication networks, including 5G (pp1–2). The text is headed "Draft" but is set out as operative regulations; it commences on publication in the Official Gazette, a date not printed (p1).

Regulations 1–2 fix the title, statewide application to distribution licensees/franchisees, commencement and definitions, including "distribution assets", "gross revenue", "telecommunication company", "telecommunication network business", "metering mechanism" and "agreement" (pp1–2). Regulation 3 requires the licensee to report the nature and extent of telecom use, its impact on licensed obligations and the revenue earned, annually through its ARR, and makes the licensee responsible for ensuring that such use does not degrade service or safety (p3).

Regulation 4 sets the operating framework: rental and related-services agreements in fixed terms at a time, extendable in like terms but not beyond the telecom company's licence; connections and smart meters at the point of installation; billing at that point with an option for consolidated division-level bills; a transparent allocation process; and an asset-access cap where there are multiple telecom licensees. It also classifies rental receipts within non-tariff income and imposes safeguards on capacity, asset safety and service quality (pp3–5). Regulation 5 prescribes how gross rent is divided between the licensee and non-tariff income (p5). Regulations 6–9 preserve the Commission's inherent powers, provide for removal of difficulties and amendment, and save the treatment of this rental non-tariff income from the MSERC MYT Tariff Regulations 2014 (pp5–6).

Standard name
Telecom Network Facilitation
Primary topics
Business separation and other business, Operating costs and other income, New connections and load changes

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document