Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala State Electricity Grid Code, 2005 (KSEGC 2005)

CodeDated 13 Jan 2006In force from 1 Apr 2006No.1/1/KERC-2006/IX dated 13th January 2006

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software, from pages 1 to 25 of 31. Check the regulator's original before you rely on it.

KSERC Notification No.1/1/KERC-2006/IX of 13 January 2006 frames the Kerala State Electricity Grid Code, 2005. A short Statement of Objects and Reasons records that s.86(1)(h) of the Electricity Act, 2003 requires each State Commission to specify a State Grid Code consistent with the Indian Electricity Grid Code, and the Code is made under that provision read with s.181(1) (p1). It comes into effect on 1 April 2006 (p1).

Chapter I states the short title, binds every agency engaged in planning, development, operation or maintenance of the Kerala power system, and lays out the enforcement ladder: persistent non-compliance goes to the KSEGC Review Panel, then to KSERC, with disconnection of the defaulting user's plant as the ultimate sanction (p1). Chapter II is a long glossary of roughly 77 defined terms covering grid, despatch, transmission, protection, safety and black-start vocabulary (p2–7).

Chapter III sets out the roles of SLDC and STU, including constitution of the Protection Committee (p7–8). Chapter IV governs system planning: distribution licensees forecast load and submit it to STU, STU prepares a ten-year generation and transmission perspective plan conforming to CEA's national plan and filed with the Commission, and users supply planning data in STU-specified formats (p8–9).

Chapter V is the connection regime — connectivity principles, the Site Responsibility Schedule, standards compliance, connection points for generating companies and distribution licensees, the application-and-offer procedure with time limits, grounds for refusing an application, contents of connection agreements, and generating-unit and reactive-compensation capability requirements (p10–13). Chapter VI covers operation planning and security management: demand estimation, operational data, transmission outage planning, operating margin, demand control, synchronism, governor free-mode operation, AVR/PSS and under-frequency load shedding (p13–17).

Chapter VII deals with despatch, metering, protection and fire protection; Chapter VIII with monitoring of generation, drawal and unit tripping; Chapter IX with contingency planning, black start and restoration responsibilities (p17–22). Chapter X creates the cross-boundary safety regime of Control Persons and work permits (p22–23); Chapter XI the safety manual, maintenance and Line Clear Permit requirements (p24–25); Chapter XII SCADA, communication links and the real-time data SLDC must hold (p25).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Connectivity and GNA, Scheduling and despatch

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document