Sharing of Cost of Terminal Benefits Regulations, 2015 — Finalisation Order

Order w.r.t Finalisation of HPERC Terms and Conditions for Sharing of Cost of Terminal Benefits Regulations, 2015

OrderDated 31 Mar 2015

Read with the Sharing of Cost of Terminal Benefits of Personnel of the erstwhile HPSEB and Successor Entities Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the HPERC's disposal order finalising the draft Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Sharing of Cost of Terminal Benefits of Personnel of the erstwhile HPSEB and Successor Entities) Regulations, 2015. It is the record of the consultation required before notification, not the regulations themselves.

The background (p1) sets out the trigger: the Himachal Pradesh Power Sector Reforms Transfer Scheme, 2010 (10 June 2010) transferred HPSEB's functions, assets and personnel to successor entities, protecting terminal benefits including pension and placing funding responsibility on HPSEB Ltd. and the State Government. Because no separate regulatory provision existed for recovering terminal-benefit cost from operation and maintenance expenses, the Commission proposed regulations under s.181(2)(zp) read with ss.61, 62 and 86 to recover past liabilities in a structured manner.

Pages 1–2 record the previous-publication steps: draft published in the Rajpatra on 7 February 2015, hosted on the Commission's website, public notice in The Tribune and Amar Ujala on 10 February 2015, with 30 days for objections, and circulation to stakeholders. Five stakeholders responded.

Pages 2–8 tabulate each objection against the Commission's view. The objections concern accounting for monthly pension contributions receivable from other entities, HPPTCL's and HPPCL's share, treatment of pension surcharge in the ARR, the quantum of liabilities transferred with assets, staffing and deputation, and whether the mechanism eases future liabilities. The Commission's recurring response is that the cost of terminal benefits is already provided for in HPSEBL's ARR, that the State Government's obligations under the Transfer Scheme remain unaffected, and that several points are not relevant to these regulations.

The order closes (p8) with a finding that regulations under s.181 may be framed prospectively and must be consistent with the Act, that the obligations cast on the State Government by the statutory transfer scheme are in no way affected or limited, and therefore that proposed sub-regulation (2) of regulation 1 requires amendment and provisions must be inserted preserving the State Government's Transfer Scheme obligations. The Commission directs that the draft amendment published be finalised and notified in the Official Gazette.

Primary topics
ARR and true-up, Operating costs and other income

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document