APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Green Energy Open Access (GEOA) and Methodology for Calculation of Charges Regulations, 2024
Arunachal Pradesh State Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access (GEOA) and Methodology for calculation of Charges) Regulations, 2024.
RegulationDated 5 Feb 2024Published in the Gazette 12 Feb 2024No. APSERC/Notification/35/2024 dated The 5th February, 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
The APSERC issued these principal regulations in the Arunachal Pradesh Gazette Extraordinary dated 12 February 2024, with the notification dated 5 February 2024 (p1). They implement the central Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2022 and create the framework for green energy open access on the State's intra-state transmission and/or distribution systems, including systems incidental to inter-state transmission (p1, p3).
Regulations 1–3 deal with commencement, definitions and scope. 'Green energy' is broad: renewable sources including hydro, storage charged from renewables, waste-to-energy and green hydrogen/ammonia (p2). Regulations 4–7 set criteria, categorize consumers as long-term, medium-term and short-term, set the 100 kW eligibility threshold for non-captive consumers, and make the Commission the verifying agency for captive status (p3).
Regulations 8–12 cover the central portal and State Nodal Agency (SLDC), treatment of existing consumers/generators, allotment priority, and the procedure and timelines for grant of GEOA and day-ahead transactions (p4–6). Regulation 13 deals with surrender, relinquishment, cancellation and reallocation of capacity (p7). Regulation 14 is the charge methodology: transmission, wheeling, cross-subsidy, standby, banking and other charges, with formulas based on ARR, peak load and energy (p7–11). Regulations 15–24 address curtailment priority, dispute resolution, special energy meters, losses, grid code compliance, collection/disbursement, green certificates, information systems and reports (p11–13). Regulations 25–29 give the Commission powers to issue orders, remove difficulties, relax, amend and interpret (p13).
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.