Multi-Year Tariff Regulations, 2021 — Statement of Reasons

Statement of Reasons

Statement of reasonsDated 1 Sep 2021AERC.781/2021/31 dated 01.09.2021

Replaced by Multi Year Tariff Regulations, 2024 — Generation, Transmission, SLDC, Distribution Wheeling and Retail Supply

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Terms and Conditions for determination of Multi Year Tariff Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Assam Electricity Regulatory Commission's Statement of Reasons for the AERC (Terms and Conditions for Determination of Multi-Year Tariff) Regulation, 2021, issued at Guwahati on 1 September 2021 under file no. AERC.781/2021/31 (p1). It is not the regulation itself: it explains why the Commission is replacing the MYT framework and records, issue by issue, what it decided to change in the draft before notification.

Part A sets out the background — that tariff terms are being specified under s.181(2)(zd) read with s.61 of the Electricity Act 2003, that AERC has followed the MYT principle since FY 2016-17 through the 2015 and 2018 regulations, and that the next control period runs from April 2022 for FY 2022-23 to 2024-25 (p1). Part B is the procedural history: the draft and Explanatory Memorandum were published on 23 July 2021 in two newspapers and on the AERC website, comments were invited by 16 August 2021, written submissions came from AEGCL, APGCL, FINER and (late) APDCL, and a public hearing was held on 1 September 2021 with named participants from each utility (p1–2).

Part C, the bulk of the document (p2–29), is a comment-disposal table running through draft regulation numbers. For each it shows the comments received and the Commission's analysis and decision. The changes it records concern definitions (change in law, force majeure, implementation agreement, O&M expenses, capital expenditure and the cut-off date), the capital investment plan and prior-approval trigger for capital expenditure schemes, treatment of uncontrollable items, carrying/holding cost, truing-up documentation, return on equity and depreciation, tax on income, working capital for distribution wheeling, prior period expenses, O&M norms for the gas-based LRPP and NRPP stations, accounting standards, open access and late-payment-surcharge provisions, and non-tariff income items (p3–29).

Part D closes the record: the Commission states it examined the submissions, decided the necessary changes, directed that the draft be finalised and notified in the Official Gazette, and thanked stakeholders (p30–31).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document