Summary
Summary written by software. Check the regulator's original before you rely on it.
JSERC's Green Energy Open-access Regulations, 2024 (Notification No. 99, dated 9 May 2024) build a state framework letting renewable-energy consumers take non-discriminatory open access over Jharkhand's intra-state transmission and distribution networks, and govern how the charges for that access are fixed. They were published in the Jharkhand Gazette Extraordinary on 9 May 2024 and come into force from that publication (p1–2).
Regulations 1–3 give the title, extent (Jharkhand) and objective, and define the key actors — both 'Green Energy Open Access Consumer' and 'Entity' turn on a contract demand or sanctioned load of 100 kW and above, with captive consumers exempt from any load limit (p2–3). Regulation 4 lists the routes by which an entity may procure green energy: own generation, third-party open access, requisition from the distribution licensee, captive plant, renewable energy certificates, and green hydrogen or green ammonia (p4–6). Regulation 5 classifies open access as long-, medium- and short-term by duration; regulation 6 (mis-titled 'Renewable Purchase Obligation') states eligibility and bars a RE generator holding a valid PPA with the distribution licensee from using open access for that PPA capacity (p6–7).
Regulations 7–11 are the institutional plumbing: the Central Nodal Agency portal and Green Open Access Registry, STU as nodal agency for long/medium-term and SLDC for short-term, allotment priority (GEOA over ordinary open access, long-term first), the application, bank-guarantee and processing-fee steps, day-ahead transactions, and the consequences of surrender or non-utilisation (p8–11).
Regulation 12 is the charging core. It lists the charge heads — transmission, wheeling, cross-subsidy surcharge, additional surcharge, standby, banking and SLDC/scheduling/deviation charges — defers most rates to Commission orders, but itself grants specific exemptions (storage-linked solar, sub-25 MW third-party and captive solar, waste-to-energy, green hydrogen/ammonia, offshore wind) and lays down the standby and banking regimes, including loss pass-through and banking-period rules (p12–17).
The remainder is housekeeping with teeth: curtailment priority, a dispute route to the Commission, metering and TOD requirements, energy-loss applicability, grid-code compliance, collection and disbursement of charges through the SNA, SLDC's public information and reporting duties, green certificates and consumer rating, plus orders/practice-direction, difficulty-removal, amendment and interpretation powers (p18–21). Annexure-1 sets the processing timeline from zero date to effective date of wheeling (p22–24).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.