CERC · Central Electricity Regulatory Commission

Tariff Filing Forms (Thermal), Part I — Terms and Conditions of Tariff Regulations, 2019

TARIFF FILING FORMS (THERMAL) FOR DETERMINATION OF TARIFF Main Tariff Form PART-I Annexure-I

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 64 of 75. Check the regulator's original before you rely on it.

The pages are pp1–64 of a 75-page tariff filing package for thermal generating stations. The document is a set of blank forms, checklists and notes to be used by a generating company when filing a tariff petition for determination of tariff for a thermal station over the 2019–24 tariff period (p23). It is not a self-contained regulation: it tells the petitioner what information to file and in what format. The forms refer to CERC’s Depreciation Rate Schedule (p25), Regulation 43 (p6) and Regulation 31 (p13).

Page 2 gives the checklist of Main Tariff Forms FORM-1 to FORM-20: summary of tariff; claimed capital cost; return on equity; plant characteristics; normative parameters; foreign loans and equity; admitted capital cost; financial package up to COD; project-specific and corporate loan allocation; additional capitalisation and its financing; depreciation; weighted average interest; draw-down schedule for IDC; fuel, limestone, capital spares, non-tariff income, water charges and statutory charges. Page 3 lists supporting forms FORM-A to FORM-T, including capital cost estimate abstracts, cost break-ups for coal/lignite and gas/liquid projects, construction/supply/service packages, cost and time overruns, end-of-life additional capitalisation, de-capitalisation, reconciliation and summary of issues. Page 4 is the supporting-document checklist, including incorporation, audited accounts, loan and equity agreements, BPSA/PPA, detailed project report, CPM/PERT charts and cost audit report, plus a note requiring e-filing and a pen drive.

Form-1 gives year-wise tariff heads and fuel/energy-charge inputs (pp5–6). Form-1(I) and 1(II) set out claimed capital cost and return on equity at normal and weighted-average rates (pp7–10). Form-2 records plant design and steam parameters (pp11–12). Form-3 captures normative parameters for tariff computation, including availability, auxiliary consumption, heat rate, fuel-oil consumption, working-capital months, O&M and MCLR (p13). Form-4/4A cover foreign loans and equity, exchange rates and hedging (pp14–16). Form-5/6 cover admitted capital cost and financing up to COD (pp17–18). Forms 7–10 cover project and corporate loans, additional capitalisation after COD and its financing (pp19–24). Forms 11–14 cover depreciation, weighted average interest and IDC/financing-charge draw-down (pp25–32). Forms 15–20 cover source-wise fuel, limestone, capital spares, non-tariff income, water and statutory charges (pp33–41). Form-A to Form-J cover new-project capital cost estimates, coal/lignite and gas/liquid cost break-ups, package details, variable/optional package details, cost overrun, time overrun, end-of-life additional capitalisation, de-capitalisation, reconciliation with books and exclusions (pp42–64).

Standard name
Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.