Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Supply Code and Connected Matters — Fourth Amendment, 2006

The Rajasthan Electricity Regulatory Commission (Supply code and connected matters) (Fourth Amendment) Regulations 2006.

RegulationDated 20 Jun 2006RERC/Secy/Reg.49 dated 20th June, 2006

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fourth Amendment to the RERC Supply Code and Connected Matters Regulations, notified at Jaipur on 20 June 2006 as Notification No. RERC/Secy/Reg.49 (p1). It grafts a self-contained enforcement regime for electricity theft and unauthorised use onto the Supply Code, and comes into force from the date of publication in the official gazette — a date the document does not print (p1).

Amendment 1 (p1) adds four officer definitions to clause 2(1): Empowered Officer (compounding, s.152), Assessing Officer (s.126), Appellate Authority (s.127) and Authorized Officer (s.135).

Amendment 2 (p1–11) inserts a new clause 41(A), "Measures to Control Theft", in four limbs. The General part (p1–4) covers powers of entry, search and seizure, the inspection-memo and seizure-memo procedure and their deemed service, disconnection where entry is obstructed, and a carve-out for landlord-to-tenant and employer-to-employee supply. Unauthorised use of electricity (p4–8) lists the categories of conduct, what the officer must do for each, the basis and period of assessment (capped at three months for domestic and agricultural, six months for others), the rate of charge, exemptions, provisional and final assessment with seven-day payment windows, interest, and appeal to the Appellate Authority on deposit of one-third of the assessed amount. Theft of energy (p8–10) states what is conclusive proof, how disconnection and civil-liability assessment work, and sets out a category-wise quantum table (p9), a twelve-month look-back and a rate of twice the tariff. Compounding (p10–11) lets the Empowered Officer compound an offence after legal proceedings begin, at rates notified by the State Government.

Amendment 3 (p11) rewrites clause 42(1), listing the purposes for which supply may be interrupted and requiring the occupant's presence, with no domestic inspection between sunset and sunrise. Two Hindi formats for the inspection and seizure memos close the document (p13–14).

Standard name
Electricity Supply Code
Primary topics
Theft and unauthorised use, Conditions of supply, Appeals to the appellate authority

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document