Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Draft Deviation Settlement Mechanism and Related Matters Regulations, 2020

West Bengal Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2020

Draft regulationDated 13 Oct 2020WBERC/Regulation-66/20-21/6116 dated 13th October, 2020

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a public notice plus the draft text of a West Bengal Electricity Regulatory Commission regulation, issued on 13 October 2020 (p2). The notice invites stakeholders to submit suggestions, objections or comments on the draft by 05 November 2020 at 3 p.m., and says copies of the draft and of the existing regulation proposed to be amended are available from the Commission's office (p2). The draft regulation follows from p3.

The draft replaces West Bengal's UI-based commercial mechanism for intra-state deviations with a frequency-linked Deviation Settlement Mechanism. Chapter 1 (pp3–4) gives the short title, extent to the whole of West Bengal, and commencement — the first Monday of the third month after Gazette publication — with UI charges continuing until the day before the effective date, and SLDC required to complete software and trial-run preparations by then. Chapter 2 (pp5–12) defines terms, links the regulation to the State Grid Code, sets out the frequency parameters and NSC/CERC LIMIT values carried from Schedule III, states the grid-discipline objective, and limits scope to short-, medium- and long-term open access transactions.

Chapter 3 (pp13–30) is the operative core. It specifies which entities fall inside or outside DSM — generating stations connected to the intra-state transmission system, embedded and captive stations, distribution licensees, and full or partial open access consumers — and the ABT metering precondition for coverage. It then sets the methodology for deviation charges, the time-block volume limits and frequency-linked additional charges, the sign-change requirement and penalties, daily deviation limits, gaming provisions, and special rules for captive generation, open access and embedded generating stations.

Chapter 4 (p31) governs weekly deviation settlement accounts, payment through SLDC-DS-FUND-WBSETCL and dispute handling. Chapter 5 (pp32–35) covers metering, the infirm-power tariff, the fund's renaming from UI to DS, SLDC reporting, intervention, removal of difficulties, dispute resolution, amendment, inherent powers, practice directions, repeal of UI provisions in the 2011 Tariff Regulations and 2007 State Grid Code with savings, and power to relax. Schedules I–III (pp35–39) hold the additional-charge tables by deviation band, thermal under-injection charges, and the spot-frequency, NSC, CERC LIMIT, infirm-power price and cap-rate values.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Metering

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document