Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025

West Bengal Electricity Regulatory Commission (Grid Interactive Rooftop Solar Photovoltaic System for Prosumers) Regulations, 2025

RegulationDated 31 Jul 2025Published in the Gazette 31 Jul 2025No. 81/WBERC dated 31st July, 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The WBERC's Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025 (Notification No. 81/WBERC, 31 July 2025) build the framework under which rooftop solar owners in West Bengal connect to the distribution grid and are settled for the energy they export. Made under s.181 read with s.86 of the Electricity Act, 2003, they took effect on publication in the Official Gazette and extend to the whole State (p1).

Part A (p1–8) holds the common machinery: definitions of prosumer, net metering, net billing, gross metering, settlement period and useful life; scope; prosumer rights (installation directly or through a RESCO/ULA, capacity capped at contract demand, battery storage allowed); the online application route, with a fee that differs by voltage class, deemed acceptance for systems up to 10 kW, a technical feasibility study above that, time-bound clearances, infrastructure-upgradation costing and installation deadlines; distribution licensee duties including portal creation, model forms, publication and a single point of contact; the quarterly reporting chain from licensee to State Agency to Commission; interconnection rules (same voltage as supply, feeder/DT capacity cap, anti-islanding, synchronisation, power-quality certification); metering (net meter plus generation meter, check meter under gross metering, AMI ports); RPO accounting; and the feed-in tariff, which the Commission determines in tariff or separate orders and which, once agreed, holds for the asset's useful life.

Parts B, C and D (p8–12) take the three settlement mechanisms in turn — net metering (1 kW to 500 kW, with annual aggregate capacity limits per licensee for 2025–26 and 2026–27), net billing, and gross metering — each with eligibility thresholds, billing-period accounting, a list of what the bill must show, and a worked billing formula in which exports or credits carry forward and are reset (or paid out, under gross metering) at the end of the settlement period.

Part E (p12) gives the Commission powers to amend, relax and remove difficulties, and repeals listed provisions of the 2020 First Amendment to its Cogeneration and Renewable Energy Regulations, with a savings clause.

Annexures 1–4 (p13–19) supply the model application form and the model net metering, net billing and gross metering agreements licensees must use.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Net billing, Gross metering

Read with this

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document