CSERC · Chhattisgarh State Electricity Regulatory Commission
Redressal of Grievances of the Consumers Regulations, 2023
Chhattisgarh State Electricity Regulatory Commission (Redressal of Grievances of the Consumers) Regulations,2l23
RegulationDated 16 Mar 2023
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Chhattisgarh State Electricity Regulatory Commission's principal regulation for consumer grievance redressal against distribution licensees. It applies to every distribution licensee in its licensed area in Chhattisgarh (p2). It comes into force from the date of notification in the Official Gazette, but the Gazette date is not printed in the text (p2). It is to be read harmoniously with the Commission's Standards of Performance and Electricity Supply Code; if inconsistent, those instruments prevail (p2).
Chapter 1 (pp2–4) defines the Act, Commission, complainant, complaint, distribution licensee, defect, electricity service, Forum, grievances, licensee, Member, Ombudsman and Rules. Grievances cover supply interruptions, voltage, load shedding, meter reading, billing (excluding unauthorised use/theft), disconnection and reconnection, delay in new connection, failure to meet standards of performance and compensation, and other service harms. It excludes matters under ss.126, 127, 135–139, 152 and 161 (p3).
Chapters 2–4 set up the two-tier redress system. Each licensee must establish one or more Forums with Commission approval, at least one per region, with a two-member composition: an independent Chairperson appointed by the Commission plus a licensee officer (p4). The regulation covers qualifications, selection committee, terms, removal and service conditions (pp4–6). It specifies Forum procedure: acknowledgement, forwarding to respondent, 7-day parawise comments, record production, third-party inspection, hearings, e-hearing, ex-parte decisions, adjournment costs, reasoned orders, time limits, compliance and reporting (pp7–12). It lists the orders the Forum can pass and the complainant's route to the Ombudsman (pp10–13). Chapter 3 (pp14–16) provides for appointment, eligibility, selection, term, jurisdiction and removal of the Electricity Ombudsman. Chapter 4 (pp16–22) sets Ombudsman powers, preconditions and limitations for representations, conciliation/mediation before hearing, hearing procedure, 45-day order timelines, compliance, finality, review and enforcement by the Commission, plus reporting and budget.
Chapter 5 (pp22–23) gives the Commission power to relax, amend and remove difficulties, requires licensee infrastructure, training and publicity, and repeals and replaces the 2011 grievance redressal regulations with savings for past actions. Annexures I–IV (pp24–30) provide formats for a Forum complaint, quarterly Forum reporting, a representation to the Ombudsman and Ombudsman quarterly reporting.
Read with this
Amendments and corrections
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.