Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Conditions of Licence Regulations, 2004

Rajasthan Electricity Regulatory Commission (Conditions of Licence) Regulations, 2004

Consolidated copyDated 15 Mar 2004RERC/Reg. No. 21 dated 15th March, 2004

A consolidated copy of a regulation Voltaic does not hold, published by RERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Rajasthan Electricity Regulatory Commission's principal Conditions of Licence Regulations, notified at Jaipur on 15 March 2004 as No. RERC/Reg. No. 21, made under section 16 read with section 181 of the Electricity Act, 2003 (p1). It applies to transmission and distribution licensees and to persons deemed licensees under section 14 of the Act (p1). It comes into force from the date of publication in the official gazette, but the gazette date is not printed in this text (p1). For existing licensees covered by the first proviso to section 14, the conditions apply from 10 June 2004 (p7).

Regulations 1–2 set the title, commencement, applicability and definitions (p1). Regulations 3–9 deal with the licence area; laying mains outside it; safety and works compliance, with transitional reliance on the Indian Electricity Rules, 1956 and the Indian Electricity Act, 1910 until new rules are framed; compulsory works; five-year perspective and annual works plans; and appointment of resident electrical engineers (p1–3).

Regulations 10–15 govern distribution and consumer-facing obligations: supply in accordance with the Supply Code, 2004, standards of performance, informing consumers of rights, general conditions of supply, public lamps and open access (p3–4). Regulations 16–20 require separate accounts, audit of accounts, testing stations and testing facilities, and up-to-date system plans (p4–5). Regulations 21–25 require compliance with State Load Despatch Centre instructions, specify charges licensees may recover, the use of surcharge for cross-subsidies, Commission directions and the procedure for enforcement orders (p5–7). Regulation 26 extends the conditions to existing licensees (p7).

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions, Conditions of supply, Standards of performance

Read with this

Voltaic does not hold the regulation itself.

No other documents to read with it are on Voltaic.

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document