BERC · Bihar Electricity Regulatory Commission
Compensation to Victims of Electrical Accidents Regulations, 2018
Bihar Electricity Regulatory Commission (Compensation to Victims of Electrical Accidents) Regulations, 2018
RegulationDated 17 Dec 2018Published in the Gazette 18 Dec 2018No. BERC-SMP-4A/2017 dated The 17th December, 2018
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Bihar Electricity Regulatory Commission made these regulations under the Electricity Act, 2003 to fix who pays, and how much, when an electrical accident kills or injures a person or animal in Bihar, and to lay down the safety and reporting duties that go with it. The notification is dated 17 December 2018 (No. BERC-SMP-4A/2017) and was published in the Bihar Gazette Extraordinary on 18 December 2018, the date from which it comes into force (p1).
Chapter I (p1–2) gives the short title, extends the regulations to the whole State of Bihar, and applies them to all generating companies and to transmission and distribution licensees in their licensed areas. It defines Authority (CEA), Commission, dependents, hurt and grievous hurt (by reference to the Indian Penal Code) and licensee, with undefined words taking their Electricity Act or distribution SoP Regulation meanings.
Chapter II (p2–3) frames this as an addition to the licensee's existing standards of performance: works must be installed, maintained and operated so as to protect people, animals and property; licensees must meet CEA mandatory safety requirements; and failure makes them liable to pay compensation for loss of human or animal life, injury or property damage. Liability is no-fault — it stands regardless of any wrongful act or neglect and notwithstanding any other law — subject to carve-outs where the accident was the direct result of an extraneous cause, and with no compensation for suicide or homicide.
Chapter III (p3–4) sets the quantum of compensation, banded by type of loss — human death, disability bands certified by the civil surgeon, hospitalisation of different durations and loss of livestock and poultry, with per-household ceilings on animal claims certified by a State Government–designated competent authority. The licensee must frame its own assessment guidelines within three months of publication; claimants keep their rights under other laws, contracts or insurance, with amounts paid here credited against other compensation; and the Commission may revise the ceilings every two years after consulting licensees.
Chapter IV (p4–6) is the operating procedure: a 24-hour accident report to the Chief Electrical Inspector and Electrical Executive Engineer on Annexure I; an enquiry report from the Electrical Executive Engineer within 15 days recommending quantum and beneficiaries; a claimant's route on Annexure II to the Director (Operation); verification and final orders within 15 days, extendable to 30 with reasons; communication of orders within seven days; payment within 15 days; appeal to the Managing Director; a presumption that any accident shows failure of safety standards, with the burden of disproof on the licensee; entitlement disputes left to civil court; compensation funded from the contingency reserve in the ARR; non-compliance treated as contravention under ss.142 and 146; monthly accident returns to the Commission by the 15th; and a duty to assist victims and dependents, including medical treatment and rehabilitation.
Chapter V (p6–7) carries residuary provisions and the Commission's powers to issue practice directions, remove difficulties, dispense with clauses, amend the regulations, plus an oddly worded repeal-and-savings clause. Annexures I–III (p8–10) supply the occurrence report form, the claim form and the checklist of supporting documents for human and animal claims.
Read with this
Earlier drafts
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.