BERC · Bihar Electricity Regulatory Commission
Determination of Threshold Limit for Development of Intra-State Transmission Projects through TBCB, 2019
Determination of Threshold limit for development of intra-state transmission projects through TBCB
RegulationDated 23 Dec 2019Published in the Gazette 24 Dec 2019No.-BERC-SMP-04/2019 dated 23th December 2019
Summary
Summary written by software. Check the regulator's original before you rely on it.
BERC's one-page gazette notification fixes the threshold above which new intra-state transmission projects in Bihar — and augmentation of existing ones — must be developed through Tariff Based Competitive Bidding (TBCB): "Rs. 100 (Hundred) crores" (p1).
It states the determination is made under s.181 read with ss.61, 66 and 86 of the Electricity Act 2003, in pursuance of clause 5.3 of the Tariff Policy, 2016 and sub-regulations 5.2 and 5.3(a) of the BERC (Multi Year Transmission Tariff & SLDC Charges) Regulations, 2018 (p1).
The operative direction is procedural: the State Transmission Utility must frame the TBCB guidelines within three months of the notification and issue them only after the Commission's approval (p1). The notification is dated 23 December 2019, carries the Bihar Gazette (Extraordinary) date of 24 December 2019, and is signed by Secretary Rameshwar Prasad Das (p1).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.