These are the Rajasthan Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2026, notified in Jaipur on 30 March 2026 and published in the Official Gazette (p34). They create a state-level resource adequacy framework binding distribution licensees, generating companies, the SLDC, the STU and other grid-connected entities (p34).
Chapter 1 sets the objective — planning generation and transmission resources to meet projected demand reliably at optimum mix — and defines the core vocabulary: capacity credit, planning reserve margin, EENS/NENS, LOLP, net load, and the long-, medium- and short-term DRAPs (p34–37). Chapter 2 establishes the four-step framework (demand assessment, generation resource planning, procurement planning, monitoring and compliance) and requires Discoms to prepare LT-DRAP (10-year), MT-DRAP (5-year) and ST-DRAP (1-year) on a rolling basis, with Jaipur Discom as nodal agency for common tools (p37–38).
Chapter 3 governs demand assessment and forecasting: CEA-aligned long/medium-term forecasts, hourly or sub-hourly short-term forecasts, scenario analysis, and aggregation to state, regional and national levels (p38–42). Chapter 4 deals with generation resource planning, including the net-load methodology for computing capacity credit factors, five-year rolling averages, PRM assessment, and allocation of resource adequacy requirements. It sets a minimum planning reserve margin of not less than 10% for Rajasthan unless the Authority or Commission specifies otherwise (p46), and sets long-term and medium-term contract shares of the total supply-side RAR at 75–80% and 10–20% respectively, subject to revision by Commission order (p48).
Chapter 5 covers procurement planning — optimal resource mix, contract tenure, capacity sharing, PPA approval, and permitted variations for emergencies or costlier existing sources (p49–53). Chapter 6 provides for monitoring and non-compliance charges, with protection for reasons beyond a Discom's control (p53–54). Chapter 7 sets data-sharing duties and a detailed annual timeline for demand forecasts, LT-NRAP/ST-NRAP, DRAP vetting, contracting and approvals (p54–57). Chapter 8 covers website disclosures, dedicated planning and real-time procurement cells, consultation, powers to issue directions, relax provisions, remove difficulties and amend, and repeals the 2004 power purchase regulations while saving existing PPAs and pending matters (p57–59).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.