Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Framework for Resource Adequacy Regulations, 2026

Rajasthan Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2026

RegulationDated 30 Mar 2026No. RERC/Secy./Reg./ 162 dated March 30, 2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are the Rajasthan Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2026, notified in Jaipur on 30 March 2026 and published in the Official Gazette (p34). They create a state-level resource adequacy framework binding distribution licensees, generating companies, the SLDC, the STU and other grid-connected entities (p34).

Chapter 1 sets the objective — planning generation and transmission resources to meet projected demand reliably at optimum mix — and defines the core vocabulary: capacity credit, planning reserve margin, EENS/NENS, LOLP, net load, and the long-, medium- and short-term DRAPs (p34–37). Chapter 2 establishes the four-step framework (demand assessment, generation resource planning, procurement planning, monitoring and compliance) and requires Discoms to prepare LT-DRAP (10-year), MT-DRAP (5-year) and ST-DRAP (1-year) on a rolling basis, with Jaipur Discom as nodal agency for common tools (p37–38).

Chapter 3 governs demand assessment and forecasting: CEA-aligned long/medium-term forecasts, hourly or sub-hourly short-term forecasts, scenario analysis, and aggregation to state, regional and national levels (p38–42). Chapter 4 deals with generation resource planning, including the net-load methodology for computing capacity credit factors, five-year rolling averages, PRM assessment, and allocation of resource adequacy requirements. It sets a minimum planning reserve margin of not less than 10% for Rajasthan unless the Authority or Commission specifies otherwise (p46), and sets long-term and medium-term contract shares of the total supply-side RAR at 75–80% and 10–20% respectively, subject to revision by Commission order (p48).

Chapter 5 covers procurement planning — optimal resource mix, contract tenure, capacity sharing, PPA approval, and permitted variations for emergencies or costlier existing sources (p49–53). Chapter 6 provides for monitoring and non-compliance charges, with protection for reasons beyond a Discom's control (p53–54). Chapter 7 sets data-sharing duties and a detailed annual timeline for demand forecasts, LT-NRAP/ST-NRAP, DRAP vetting, contracting and approvals (p54–57). Chapter 8 covers website disclosures, dedicated planning and real-time procurement cells, consultation, powers to issue directions, relax provisions, remove difficulties and amend, and repeals the 2004 power purchase regulations while saving existing PPAs and pending matters (p57–59).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Energy storage deployment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document