Multi Year Tariff Regulations for Third Control Period — Discussion Paper

Discussion Paper on Multi Year Tariff Regulations for Third Control Period

Draft regulationDated 19 Feb 2016

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

What it is. This is a consultant's discussion paper prepared by ABPS Infrastructure Advisory Private Limited for the Gujarat Electricity Regulatory Commission (GERC), dated February 2016 (p1). It is not a notified regulation. It reviews the GERC (Multi Year Tariff) Regulations, 2011 and proposes amendments and draft clauses for the third Control Period (p1, p6–8). It follows a Terms of Reference to analyse the 2011 regulations, compare CERC/SERC practice, use Forum of Regulators reports and court/APTEL judgments, and prepare a discussion paper with draft amendments (p6–9).

Sections 1 and 2. Section 1 sets out the legal backdrop: Electricity Act 2003 section 61 requires MYT principles, and the 2011 GERC MYT Regulations superseded the 2005 and 2007 frameworks (p6). It records the consultancy engagement and ToR (p7–9). Section 2 covers general MYT principles. It recommends continuing modified cost-plus regulation with prudence check (p10–11), continuing normative operational and O&M norms rather than only principles (p11–13), and discontinuing a separate MYT Business Plan in favour of a single MYT application (p13–19). It discusses the control period (p20–21), revision of operational norms (p21–22), controllable and uncontrollable factors (p23–25), sharing of gains and losses (p25–31), annual tariff determination (p31–33) and carrying cost on trued-up or deferred revenue gaps (p33–35).

Section 3. This section sets out broad financial principles: debt-equity and treatment of consumer contribution, grants and deposit works (p36–38, p61–67), return on equity versus capital employed and tax treatment (p38–43), capital cost and additional capitalisation (p43–47), depreciation and loan repayment (p47–50), interest on long-term loans (p50–52), interest on working capital (p52–62), rebate (p67–70), de-capitalisation (p70–71), O&M expenses (p71–73), bad debts (p73–74), contingency reserve (p74–76), delayed payment surcharge (p76–77) and prior-period items (p77).

Section 4. This is the largest part, on generation tariff. It covers annual fixed charges (p80–81), common issues for thermal and hydro stations including provisional tariff and R&M or special allowance (p81–95), thermal stations (p95–167) and hydro stations (p167–180). For thermal stations it discusses infirm power, tariff components, fixed cost recovery linked to availability, norms for new and existing stations such as station heat rate, auxiliary consumption, secondary fuel oil and transit losses, O&M expenses, incentive mechanism, and landed fuel cost (p95–167). For hydro it discusses capacity and energy charges, NAPAF, auxiliary consumption and transformation loss, O&M and infirm power (p167–180).

Sections 5 to 8. Section 5 deals with transmission: GETCO as STU (p181), key issues and regulatory developments (p181–188), sharing of intra-state transmission charges and a proposed simplification away from pooling (p182–188), and performance/incentive norms plus O&M norms for transmission licensees (p189–194). Section 6 covers SLDC: budget, applicability, connection applications, capital investment plan, levy and collection of charges, O&M, non-tariff income, determination of fees and charges, billing and collection, and the LDC Development Fund, with a proposal to merge SLDC fees regulations into the MYT Regulations (p195–201). Section 7 covers distribution wires: background of the Gujarat distribution sector, ARR components, distribution loss versus AT&C loss, separation of wires and supply accounts and the allocation matrix, O&M norms and wheeling charge determination (p202–209). Section 8 covers retail supply: O&M norms, tariff philosophy and bad debts (p210–211).

Overall. The paper is a preparatory, consultative document. It proposes to retain many features of the 2011 framework while aligning them with CERC Tariff Regulations 2014, APTEL/High Court/Supreme Court rulings and Forum of Regulators recommendations. It states proposed clauses throughout, so it should be read as a source of proposals and rationale, not as operative law.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, Generation tariff

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.