Skip to content

BERC · Bihar Electricity Regulatory Commission

Standards of Performance of Distribution Licensee Regulations, 2006

Bihar Electricity Regulatory Commission (Standards of Performance of Distribution Licensee) Regulations, 2006

RegulationDated 18 Jan 2007Published in the Gazette 22 Jan 2007Notification No. 1/2007 dated 18th January, 2007

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Bihar Electricity Regulatory Commission's consolidated service-standard code for distribution licensees, notified on 18 January 2007 and published in the Bihar Gazette on 22 January 2007 (p1). It is made under sections 181(1) and 181(2)(za) read with sections 57–59 of the Electricity Act 2003, applies to all distribution licensees in their licensed areas of Bihar, and comes into force three months after gazette publication (p1).

Chapter 1 (pp1–5) defines the working vocabulary — area of supply, licence holder, consumer, danger, emergency periods, and the LT/HT/EHT voltage classes, plus urban and rural areas and the several kinds of outage — and lays down record-keeping duties, including the complaint registers in Appendices A and B. It excludes stand-alone and non-conventional energy systems, and defers application to rural local distribution systems run by panchayats, cooperatives, user associations and NGOs for five years, during which those bodies must frame their own Commission-approved standards (p5).

Chapter 2 (pp5–7) prescribes safety practice: construction and maintenance to the Indian Electricity Rules 1956 and CEA safety regulations, earthing to IS:3043, guarding, lightning protection and leakage-current measurement, consumer safety education, and 24-hour reporting of fatal electrocution accidents to the Chief Electrical Inspector (p7). Chapter 3 (pp7–8) sets complaint handling — registration with a unique number, prescribed offices, escalation, and classification of complaints.

Chapter 4 (pp8–11) sets power quality and reliability: voltage-variation bands by voltage level, frequency left to the Indian Electricity Grid Code/State Grid Code, a harmonics investigation and monitoring duty, and the SAIFI, SAIDI and MAIFI indices computed per 11 kV feeder and reported quarterly, with targets to be fixed by the Commission after three years (p11).

Chapter 5 (pp11–16) is the service-delivery rulebook: timeframes for new LT, HT and EHT connections, temporary supply, load enhancement and reduction, shifting of meters, lines and transformers, tariff-category change, change of name, defective meters, erroneous bills and reconnection. Chapter 6 (pp16–17) states the overall performance standards as percentage achievement levels for fuse-off calls, breakdowns, transformer replacement, scheduled outages, street lights, billing mistakes, faulty meters, voltage unbalance and new connections.

Chapter 7 (pp18–21) converts the Schedule's standards into guaranteed standards, with compensation payable to affected consumers, exemptions for force majeure and for grid, transmission or SLDC causes, and payment by bill adjustment within 90 days (p19). Chapter 8 (pp22–23) covers quarterly and annual reporting, repeal of earlier orders with savings for action already taken, preservation of consumer rights, and powers to remove difficulties and to amend. Appendices A–D (pp24–28) supply the complaint registers and the performance and compensation reporting formats.

Standard name
Standards of Performance
Primary topics
Standards of performance, Power quality, New connections and load changes

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document