MSERC · Meghalaya State Electricity Regulatory Commission
Meghalaya Electricity Supply Code (1 of 2026) Regulations, 2026
Meghalaya State Electricity Regulatory Commission (Electricity Supply Code) (1 of 2026) Regulations, 2026
CodeDated 22 Apr 2026MSERC/ESC/2024/16 dated 22nd April 2026
Summary
Summary written by software, from pages 1 to 33 of 145. Check the regulator's original before you rely on it.
The document is the Meghalaya State Electricity Regulatory Commission (Electricity Supply Code) (1 of 2026) Regulations, 2026, issued by MSERC, Shillong, and dated 22 April 2026 under notification number MSERC/ESC/2024/16 (p1–2, p4). The preamble records that it supersedes the earlier 2018 Supply Code, follows the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020, and was finalised after a draft public notice on 22 January 2026, an extended comment deadline of 10 March 2026 and a public hearing on 11 March 2026 (p2–3). It comes into force on publication in the Meghalaya Gazette and extends to the whole State.
Chapter 1 (General, pp4–22) sets applicability to distribution and retail supply licensees, including deemed licensees and consumers, exempted persons under s.13, and unauthorised use/theft cases. It lists related MSERC regulations—Standards of Performance 2012, Consumer Grievances and Ombudsman 2017, and Rooftop Solar Net Metering 2015—with this Code prevailing on inconsistency. It defines common terms and then sets out licensee rights and obligations on security, disconnection, entry/search, applications, web and mobile service channels, smart/prepaid metering, billing, call-centre and CGRF arrangements, and CEA compliance. Consumer rights and obligations are also listed.
Chapter 2 (System of Supply and Classification of Consumers, pp23–30) specifies frequency and voltage bands for LT, HT and EHT supply, classification by connected load, lower-voltage supply, load balancing, consumer classification, contract and billing demand, annual demand review, power-factor standards and capacitor requirements, and the components of electricity charges.
Chapter 3 (Procedure for Release of New Connection and Modification in Existing Connection, pp31–33, partial) sets the licensee's duty to supply, cost-sharing for distribution extension, exceptions, conditions for grant, application and tracking requirements, and a priority/waiting list. Later chapters and annexures are only cross-referenced.
Read with this
No other documents to read with it are on Voltaic.
2 more documents belong here and are not on Voltaic: 1 commencement notice or statement of reasons not held as English text and 1 draft or notice on a draft not held as English text.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.