MPERC · Madhya Pradesh Electricity Regulatory Commission

Furnishing of Technical Details by Generating Companies Regulations, 2011

Madhya Pradesh Electricity Regulatory Commission (Furnishing of Technical Details by Generating Companies) Regulations, 2011 (G-37 of 2011)

RegulationDated 17 Jun 2011No.1807/MPERC/2011

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These Regulations require generating companies operating in Madhya Pradesh to report prescribed technical details of their generating stations to the Commission on a recurring basis, and to file details up front for stations still being set up. They were framed by MPERC in line with the CERC (Furnishing of Technical Details by Generating Companies) Regulations, 2009, to create a state-level reporting follow-up (p1–2).

The Preamble records the CERC regulation as the model and states that, besides thermal and hydro generators, renewable sources — biomass, biogas, bagasse-based co-generation, small hydro, wind, solar PV and solar thermal — are also covered (p1–2). Regulation 1 gives the short title, provides that the Regulations take effect on publication in the Madhya Pradesh gazette (date not printed) and extend to the whole State (p2). Regulation 2 defines Act, Commission, Generating Company, Generate and Generating Station (p2).

Regulation 3 is the operative provision: every generating company operating or setting up a station is to furnish the details in the appended Forms A, B and C, as applicable to the station type, separately for each stage, showing status as on 1st April, by 30th April each year, with a soft copy (p2). Two provisos set the first-report deadlines for new stations — three years before projected COD for non-renewable, and immediately on finalisation but no later than six months before scheduled commissioning for renewables (p3). Regulations 4 to 6 give the Commission power to remove difficulties, to amend the Regulations, and savings clauses preserving its inherent powers and its ability to depart from the Regulations (p3).

Standard name
Compliance Audit and Furnishing of Information
Primary topics
Compliance and reporting

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document