Skip to content

SSERC · Sikkim State Electricity Regulatory Commission

Renewable Consumption Obligation and its Compliance Regulations, 2025

Sikkim State Electricity Regulatory Commission (Renewable Consumption Obligation and its Compliance) Regulations, 2025

RegulationDated 8 Jul 2025Published in the Gazette 14 Jul 2025No. 71/SSERC/2021-22/Part-II/188 dated 08/7/2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on sserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Sikkim State Electricity Regulatory Commission's principal regulation on Renewable Consumption Obligation (RCO), notified 8 July 2025 and published in the Sikkim Government Gazette on 14 July 2025, taking effect on that publication date (p1). It extends to the whole State and replaces the SSERC (Renewable Purchase Obligation and its Compliance) Regulations, 2022, with a savings clause preserving past actions and re-routing treatment of old certificates to the CERC REC framework (p12).

Definitions (pp1–3) fix the vocabulary: Obligated Entity, RCO, Designated Consumer, Distributed Renewable Energy Component, Hydro Renewable Obligation, State Agency, Central Agency, Certificate and 'Year' (April–March). Regulation 3 (p3) specifies who is obligated — designated consumers under the Energy Conservation Act, open-access or other consumers of conventional power, and captive generating plants above a stated installed-capacity threshold — while excluding retail consumption from a distribution licensee. Regulation 4 and Table-1 (pp3–6) set the year-wise minimum renewable consumption, split into wind, hydro, distributed and 'other' components, with rules for inter-category adjustment and for computing consumption and sales; targets run to 2029-30 with a roll-over clause. Regulation 5 (pp6–8) specifies the instruments that count toward fulfilment — own generation, RE purchase, free/royalty power, banking, RECs and certain rooftop solar and green hydrogen consumption — and how shortfalls may be offset. Regulation 6 (p8) makes CERC-issued RECs the discharge instrument and bars double counting between distribution licensees and RE generators.

Regulation 7 (pp8–9) designates the Sikkim SLDC as State Agency and requires an RCO web-portal; Regulation 8 (pp9–10) sets registration and quarterly/annual reporting duties; Regulation 9 (p10) splits the compliance filing route at a stated capacity threshold; Regulation 10 (pp10–11) specifies a monetary penalty for shortfall and a separate fund, plus liability under s.142 of the Act. Regulations 11–17 (pp11–13) cover REC-mechanism purchases, overriding effect over tariff and open-access regulations, difficulty-removal and direction powers, savings of inherent powers, repeal and interpretation. Appendix-I (pp17–42) supplies the DISCOM, captive and open-access reporting formats, including website-upload formats.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on sserc.org ↗

Report an issue with this document