This is a GERC regulation, issued as Notification No. 1 of 2005, that lays down how a person may appeal to the Appellate Authority against a final order made under section 126 of the Electricity Act 2003 (p1). It extends to the whole of Gujarat and comes into force on Gazette publication; the Gazette date is not printed and the Ahmedabad signature block carries no date (p2, p4).
Chapter I — Preliminary (p2–3) states the short title, extent and commencement, defines a small set of terms (Act, Appellate Authority, Commission, Licensee — a distribution licensee, month, Regulations, State Act) with fallback rules for undefined expressions, and applies the Bombay General Clauses Act, 1904.
Chapter II — Procedure for Filing of Appeal (p3–4) is the operative core: it fixes the filing window at 30 days from the order, makes deposit of one third of the assessed amount with the licensee a precondition to the appeal being entertained, requires the appeal in the Schedule form in duplicate, and sets a fee that steps up above an assessed amount of Rs 100,000. It asks the Appellate Authority to decide, so far as practicable, within 120 days of filing.
Chapter III — Miscellaneous (p4) lets the Commission issue implementation orders and guidelines and amend the regulations at any time.
The Schedule (p5–7) is the Memorandum of Appeal form itself — appellant and respondent particulars, licensee and assessing-officer details, premises, meter and inspection data, the assessment and objection history, grounds of appeal, deposit and fee declarations, prayer, and a verification to be affirmed before a notary.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.