APERC · Andhra Pradesh Electricity Regulatory Commission
Terms and Conditions for Tariff Determination (Generation Supply and Distribution Purchase), 2008
Andhra Pradesh Electricity Regulatory Commission (Terms and conditions for determination of tariff for supply of electricity by a generating company to a distribution licensee and purchase of electricity by distribution licensees) Regulation, 2008
RegulationDated 1 Sep 2008Published in the Gazette 1 Sep 2008Regulation No. 1 of 2008 dated 01-09-2008
Summary
Summary written by software, from pages 1 to 43 of 87. Check the regulator's original before you rely on it.
The Andhra Pradesh Electricity Regulatory Commission issued Regulation No. 1 of 2008 under ss.61, 62 and 86(1)(b) read with s.181 of the Electricity Act, 2003, to set terms and conditions for determining tariffs for generation sold to distribution licensees and for distribution licensees' power purchases (p1–2). It extends to the whole State of Andhra Pradesh and came into force on publication in the A.P. Gazette, printed as 1 September 2008; it remains in force until amended by the Commission (p1, p3). It applies to generating companies supplying or intending to supply a distribution licensee and to distribution licensees buying from generating companies, other licensees including trading licensees, captive generating plants and any other source, but non-conventional sources are routed to separate Commission orders (p2). Part I (pp8–12) requires a Power Procurement Plan, allows short-term purchases under Commission guidelines, distinguishes tariff adoption after competitive bidding from capital-cost tariff determination, limits the latter largely to state-owned/controlled companies and specified private expansion cases with 2006-related deadlines, and sets application, publication and disposal procedures. Part II (pp12–26) is the core: it specifies filing details; capital cost, debt-equity, return, depreciation, O&M, working capital and tax methodology; thermal and hydro norms for availability, capacity index, auxiliary consumption, heat rate, secondary fuel oil and transit/transformation losses; energy charge and fuel price adjustment mechanics; unscheduled interchange charges; incentive, rebate/late payment, billing, declared-capacity demonstration penalties and deemed generation. Part IV (p26) reserves the Commission's power to amend and includes a savings clause. Annexure III (p27) gives the fuel price adjustment formula. Pages 28–43 append hydro tariff filing forms and a checklist listing forms up to Form-17.
Read with this
Procedures and orders made under it
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.