Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Terms and Conditions for Tariff Determination (Generation Supply and Distribution Purchase), 2008

Andhra Pradesh Electricity Regulatory Commission (Terms and conditions for determination of tariff for supply of electricity by a generating company to a distribution licensee and purchase of electricity by distribution licensees) Regulation, 2008

RegulationDated 1 Sep 2008Published in the Gazette 1 Sep 2008Regulation No. 1 of 2008 dated 01-09-2008

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software, from pages 1 to 43 of 87. Check the regulator's original before you rely on it.

The Andhra Pradesh Electricity Regulatory Commission issued Regulation No. 1 of 2008 under ss.61, 62 and 86(1)(b) read with s.181 of the Electricity Act, 2003, to set terms and conditions for determining tariffs for generation sold to distribution licensees and for distribution licensees' power purchases (p1–2). It extends to the whole State of Andhra Pradesh and came into force on publication in the A.P. Gazette, printed as 1 September 2008; it remains in force until amended by the Commission (p1, p3). It applies to generating companies supplying or intending to supply a distribution licensee and to distribution licensees buying from generating companies, other licensees including trading licensees, captive generating plants and any other source, but non-conventional sources are routed to separate Commission orders (p2). Part I (pp8–12) requires a Power Procurement Plan, allows short-term purchases under Commission guidelines, distinguishes tariff adoption after competitive bidding from capital-cost tariff determination, limits the latter largely to state-owned/controlled companies and specified private expansion cases with 2006-related deadlines, and sets application, publication and disposal procedures. Part II (pp12–26) is the core: it specifies filing details; capital cost, debt-equity, return, depreciation, O&M, working capital and tax methodology; thermal and hydro norms for availability, capacity index, auxiliary consumption, heat rate, secondary fuel oil and transit/transformation losses; energy charge and fuel price adjustment mechanics; unscheduled interchange charges; incentive, rebate/late payment, billing, declared-capacity demonstration penalties and deemed generation. Part IV (p26) reserves the Commission's power to amend and includes a savings clause. Annexure III (p27) gives the fuel price adjustment formula. Pages 28–43 append hydro tariff filing forms and a checklist listing forms up to Form-17.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Capital cost and investment

Read with this

Procedures and orders made under it

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document