SSERC · Sikkim State Electricity Regulatory Commission
Demand Side Management Regulations, 2017
Sikkim State Electricity Regulatory Commission (Demand Side Management) Regulations, 2017
RegulationDated 8 Nov 2017Published in the Gazette 29 Dec 2017No: 17/SSERC/DSM/2017 dated 08.11.2017
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Sikkim State Electricity Regulatory Commission's principal regulation on Demand Side Management, notified as No. 17/SSERC/DSM/2017 dated 08.11.2017 and published in the Extraordinary Gazette of 29 December 2017 (p1). It is made under s.181(2)(zp) of the Electricity Act, 2003 and binds Distribution Licensees in Sikkim; it comes into force from the date of Gazette notification (p1).
Chapter 1 (pp1–3) gives the short title, extent and commencement, a set of DSM-specific definitions (avoided costs, baseline data, cost effectiveness index, demand-side resource, DSM resource acquisition, energy service company, load management, load research, quarter and others), and interpretation rules, including that the English text prevails over Hindi in case of variation (p3).
Regulations 4–5 (pp3–4) set the objectives and guiding principles every Distribution Licensee must follow — demand control and shifting, complementing supply-side options, environmental benefit, alignment with Bureau of Energy Efficiency programmes, and no undue burden on participating or non-participating consumers. Regulation 6 (p4) requires technical-potential assessment, market research and baseline data development, with possible independent verification by the Commission.
Regulations 7–9 (pp5–7) are the working core: the Commission may set DSM targets and issue process guidelines; the licensee must prepare a perspective DSM Plan and annual programmes, submit them for in-principle and annual approval, and may not implement any programme without prior Commission approval. Regulation 10 (p7) covers implementation. Regulation 11 (p7) provides the cost-recovery mechanism through tariff or another route, conditional on approval, cost-effectiveness and self-sustainability, with a carve-out for socially beneficial but non-cost-effective programmes funded by the Commission.
Regulations 12–14 (pp7–8) cover monitoring and reporting: evaluation, measurement and verification of savings, Commission-appointed independent agencies, quarterly and annual progress reports and a completion report. Regulation 15 (p8) allows incentives for achieving or exceeding DSM objectives. Regulation 16 (pp8–9) preserves the Commission's powers to direct, relax, amend and act outside these Regulations.
The instrument is largely framework-setting: many operational details — targets, eligibility criteria, cost-effectiveness methodology, timelines, funding levels — are left to guidelines the Commission may issue later.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.