Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Terms and Conditions for Open Access Regulations, 2016

Rajasthan Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2016

RegulationDated 27 Jan 2016No. RERC/Reg. No. 115 dated January 27, 2016

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Notification No. RERC/Reg. No. 115 of 27 January 2016 is the Rajasthan Electricity Regulatory Commission's principal open access regulation, made under section 42 read with section 181 of the Electricity Act, 2003. It replaces the 2004 open access regulations and sets the whole framework — eligibility, categorisation, application procedure, charges, metering, scheduling and curtailment — for use of the intra-State transmission system and licensees' distribution systems in Rajasthan, including where those systems are used in conjunction with the inter-State network (p1–2). It comes into force on gazette publication; that date is not printed (p1).

Regulations 1–4 (p1–3) give the short title, commencement and definitions, state the extent of application, and set eligibility: licensees, generating companies including captive generators and consumers may seek open access on payment of transmission and wheeling charges, with consumers also paying cross subsidy and additional surcharge. Access for consumers is admissible at a contract demand of "one MVA and above", with an exemption for persons covered by an existing State Government policy on captive generation or non-conventional energy sources (p2). Consumers on common feeders or at 33 kV and below must accept rostering restrictions; those on independent feeders at 132 kV and above are protected from power cuts to the extent of open access power, with penal billing and possible withdrawal of open access for drawal during a power cut (p2–3). Single-point-supply consumers and insolvent or dues-defaulting applicants are excluded (p3). Regulations 5–6 (p3) preserve the position of existing distribution licensees and of existing consumers and generators availing open access under the 2004 Regulations or a government policy.

Regulations 7–12 (p3–11) are the operative machinery: three customer categories (long term, medium term, short term), a priority ladder headed by distribution licensees, and separate procedures for each category including application formats, fees and bank guarantees (p5–7), the window in which medium term access may start (p7), and the short-term regimes — open access in advance, limited-period access and electronic bidding where capacity is short or congestion is expected (p8–11). Regulation 9 requires the STU, with SLDC, to prepare a detailed procedure with formats and submit it for Commission approval within 30 days; that procedure, not this document, carries the formats (p4).

Regulations 13–24 (p11–18) handle agreements and undertakings, surrender and relinquishment compensation, the charge heads (transmission, wheeling, cross subsidy, additional surcharge, SLDC fees), metering and communication requirements, deviation/unscheduled interchange pricing, reactive energy charges, energy loss sharing, and payment security deposited with the STU, SLDC and the distribution licensee.

Regulations 25–32 (p18–22) cover the order in which a consumer's drawal is adjusted among renewable, captive, banked, bilateral and exchange sources; grid discipline and scheduling obligations; who collects and pays each charge; the curtailment ladder (short term first, distribution licensee last); the SLDC's open access information-posting duties; a three-tier grievance route through the SLDC, the State Power Committee and the Commission; the Commission's power to remove difficulties; and the repeal of the 2004 Regulations with savings for existing open access and a 90-day option to surrender. An abbreviation table closes the document (p23).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Scheduling and despatch

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document