APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Demand Side Management Regulations, 2024
Arunachal Pradesh State Electricity Regulatory Commission (Demand Side Management) Regulations, 2024
RegulationDated 27 Jun 2024Published in the Gazette 3 Jul 2024No.APSERC/NOTIFICATION/48/2024. dated The 27th June, 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
The APSERC Demand Side Management Regulations, 2024 are a principal state regulation for Arunachal Pradesh, issued by notification dated 27 June 2024 and published in the State Gazette on 3 July 2024 (p1). They bind every distribution licensee in the State to plan, fund, run, monitor and verify demand-side management (DSM) programmes, and give the Commission the powers to approve, direct, fund and incentivise.
Chapter 1 (p1–2) sets the title, statewide extent and commencement on gazette publication, and defines the working vocabulary — baseline data, avoided costs, cost effectiveness index, DSM resource acquisition, load management, load research, point of supply and others. Chapter 2 (p2) is a short rationale: DSM complements supply-side options, defers costly capacity additions, aids renewable penetration and climate goals. Chapter 3 (p3–5) states the objectives — controlling, shifting and reducing demand, avoiding costly capacity and power purchases, cutting emissions and aligning with BEE's national DSM programmes — and requires licensees to assess technical potential ahead of each MYT control period and to propose DSM targets for the Commission's approval, guided by BEE methodology and Commission guidelines.
Chapters 4–5 (p5–7) are the operating core: each licensee must constitute a DSM Cell, carry out load and market research and build baseline data, file a perspective DSM Plan plus rolling annual plans, prepare a Programme Document for each programme, obtain prior Commission approval before implementing, recover costs through the ARR, and report periodically, with third-party evaluation, measurement and verification. Chapter 6 (p7) requires six-monthly progress reports and a programme completion report after each programme ends. Chapter 7 (p7–8) governs multi-year and annual DSM budgets tied to MYT/ARR filings. Chapter 8 (p8) provides for incentives. Chapter 9 (p8) covers amendment, removal of difficulties, directions, relaxation and dispute resolution by the Commission.
Read with this
Earlier drafts
- Dated 16 May 2024Demand Side Management Regulations, 2024
- Dated 14 May 2024Public notice: Draft Demand Side Management Regulations, 2024 — Public Consultation Notice
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.