MPERC · Madhya Pradesh Electricity Regulatory Commission
Smart Grid Regulations, 2016
Madhya Pradesh Electricity Regulatory Commission ( Smart Grid ) Regulations, 2016
RegulationDated 29 Sep 2016Published in the Gazette 7 Oct 2016N0.1578 /MPERC/2016 dated 29.09.2016
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Madhya Pradesh Electricity Regulatory Commission's principal regulation for smart grid development in the State, made under s.181(2)(zp) of the Electricity Act, 2003 and numbered G-41 of 2016. It applies to all generating companies, transmission licensees, distribution licensees and consumers in the State connected to the state grid, extends to the whole of Madhya Pradesh, and commences on publication in the MP Gazette — the notification is headed 'Notified on 07.10.2016' and dated 29.09.2016 (p1).
Regulation 2 (pp1–3) defines the working vocabulary: advanced metering infrastructure including smart meters, aggregators, cyber security, electric energy storage, interoperability, key performance indicators, microgrids, smart grid and wide area measurement systems. Regulations 3 and 4 (pp3–4) state the objectives — integrating smart grid technologies for economy and efficiency across generation, transmission and distribution, better network management, network security, renewable and microgrid integration, visibility and consumer service — and let the Commission issue guidelines on smart grid programmes, cost-effectiveness assessment, monitoring, customer engagement and data protection, capacity building and database frameworks. Issuing such guidelines is expressly not a precondition for submitting a smart grid plan.
Regulation 5 (p4) requires every transmission licensee and distribution licensee to constitute a Smart Grid Cell within three months of notification, with defined functions from baseline study through project design, approvals, execution and reporting, and permits combining it with energy efficiency and demand side management cells.
Regulations 6 to 10 (pp5–7) set the process: baseline studies and database building; an integrated multi-year Smart Grid Plan submitted with the MYT or ARR petition; project proposals going to the Commission for prior investment approval with a detailed project report, customer engagement and training plans; approval criteria with Commission discretion to modify proposals, fix cost-recovery methodology and create incentive/disincentive mechanisms for licensees and consumers; execution against CEA standards and, where absent, BIS and then IEC/IEEE/ANSI standards for network, communication, interoperability and cyber security; and recovery of net incremental costs through tariff only where the programme was approved beforehand and implemented as approved.
Regulations 11 to 13 (pp7–8) require a programme and project completion report within one month of completion, published on the licensee's website; monitoring, evaluation, measurement and verification through KPIs decided by the Commission; and give the Commission power to amend the regulations, remove difficulties by order and issue implementation directions. The Schedule (p9) lists indicative smart grid project components, from AMI and demand response to microgrids, distribution SCADA, WAMS, storage, renewable integration, EV grid interaction and dynamic tariff mechanisms.
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.