Wind, Solar and Hybrid (with or without ESS) Forecasting, Scheduling and Deviation Settlement Regulations, 2026 — Draft
Tamil Nadu Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matters for Wind, Solar and Hybrid Generation(with or without ESS)) Regulations, 2026
Draft regulationDated 27 May 2026TNERC/DSM/Wind & Solar/21-3/2026 dated 27-05-2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Tamil Nadu Electricity Regulatory Commission draft notification dated 27-05-2026, inviting objections and suggestions by 11-06-2026 on a 2026 framework for forecasting, scheduling and deviation settlement for wind, solar and hybrid generation, with or without energy storage (p1). Although the notice describes the draft as amendments to the 2024 Regulations, the operative draft and the Statement of Reasons propose to repeal the 2024 Regulations and notify fresh 2026 Regulations (p1, p35, p38-39).
Part A sets the title, extent to Tamil Nadu, commencement on Gazette publication with the commercial implementation date left blank, and definitions, including energy storage, hybrid generating stations and three categories of Qualified Coordinating Agency (QCA) (p3-7). It states the objective of integrating variable renewable generation while maintaining grid security and applies the regulations to wind, solar and hybrid generators connected to the intra-state transmission or distribution system, excluding grid-interactive rooftop solar projects of less than 1 MW (p8-9).
Part B is the Forecasting and Scheduling Code. It sets the framework for generators to appoint a QCA, including State-wide and pooling-sub-station-wise options, graduated penalties for non-appointment, QCA registration and obligations, day-ahead/week-ahead and intra-day schedules, schedule revisions, and the Detailed Procedure to be issued by SLDC (p9-16). It also treats intentional misdeclaration as gaming and sets out the principles for QCA appointment at wind, solar and hybrid pooling sub-stations (p17-21).
Part C contains the commercial arrangements: intra-state deviation charges by absolute-error bands for wind, solar/hybrid and hybrid categories, a ceiling on aggregate monthly charges, force majeure exclusions, inter-state settlement under CERC DSM Regulations, metering and AMR arrangements, QCA-SLDC communication, deviation and energy accounting, payment security and interest, de-pooling, curtailment and dispute resolution (p21-35).
Part D covers amendment, repeal and savings, contracts, cyber security, confidentiality, removal of difficulties, relaxation and suo motu directions (p35-37). The Statement of Reasons explains the SLDC petition, practical difficulties with the 2024 framework, and the changes proposed (p38-42).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.