NERC · Nagaland Electricity Regulatory Commission
Consumer Grievances Redressal Forum and Electricity Ombudsman Regulations, 2012
Nagaland Electricity Regulatory Commission, NERC (Consumer Grievances Redressal Forum and Electricity Ombudsman) Regulations, 2012
RegulationDate not statedNo.NERC/REGN/2012(B)
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are the Nagaland Electricity Regulatory Commission's consumer grievance redressal regulations, issued at Kohima under s.181(2)(r)–(s) read with s.42(5)–(7) of the Electricity Act 2003 (p1). They extend to the whole State of Nagaland and come into force on publication in the State Gazette (p2). They bind the Department of Power, Nagaland — treated as the distribution licensee / integrated utility in its present or successor form (p2) — and create a two-tier redressal chain: licensee-level Internal Grievance Redressal Cells, then a Forum, then the Electricity Ombudsman.
Chapter I defines the actors and terms, and subordinates these Regulations to the licensee's standards of performance and the Electricity Supply Code where there is inconsistency (p2–6). Chapter II classifies consumer complaints, requires IGR Cells with complaint registers, and lays down how licensee officers must receive and handle complaints (p6–9). Part II requires every licensee to establish a Forum at each Electrical Circle HQ within a stated period, prescribes the three-member composition, qualifications, tenure, quorum, disqualifications and cost-bearing, and then sets the Forum's procedure — acknowledgement, limitation, grounds for non-admission, excluded subject matter, record-keeping and decision timelines — plus appeal to the Ombudsman and quarterly monitoring reports (p9–16).
Part III covers the Electricity Ombudsman: appointment and tenure, functions, powers, conciliation and mediation, recommendations, awards and the consequences of non-acceptance, alongside difficulty-removal, reporting, practice-direction, amendment and saving provisions (p16–24).
Schedule I is the operational core — it maps each complaint category (interruption, voltage, load shedding, metering, billing, disconnection/reconnection, new connections and others) to lodgement levels and escalation offices with time limits (p25–42). Schedule II sets the licensee's implementation duties, and Forms 1–4 and Appendices A–B prescribe the complaint, register, reporting, Forum and Ombudsman formats (p43–54).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.