PSERC · Punjab State Electricity Regulatory Commission
Punjab Renewable Purchase Obligation and its Compliance Regulations, 2022
Punjab State Electricity Regulatory Commission (Renewable Purchase Obligation and its compliance) Regulations, 2022
RegulationDated 12 Dec 2022Published in the Gazette 14 Dec 2022In force from 1 Apr 2023No. PSERC/Secy./Reg./169 dated The 12th December, 2022
Summary
Summary written by software. Check the regulator's original before you rely on it.
PSERC notification No. PSERC/Secy./Reg./169, dated 12 December 2022 and gazetted on 14 December 2022, replaces the Commission's 2011 renewable purchase obligation regulations with a new framework taking effect on 1 April 2023 across Punjab (p1). It is made under sections 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003 (p1).
Regulations 1–2 fix commencement, territorial application and definitions — who counts as an obligated entity (distribution licensee, open access consumer, captive user), the 1 MW contract-demand / installed-capacity thresholds that pull open access consumers and captive users into scope, the Central Agency, the CERC REC Regulations 2022, the State Agency, and 'Year' as financial year (p1–2).
Regulation 3 is the core: a year-by-year RPO percentage trajectory running from FY 2023-24 to FY 2029-30 — an aggregate target with no solar/non-solar split — calculated in energy terms as a share of an obligated entity's total consumption (p2–3). Provisos say what qualifies: RE from any source, storage-backed solar/wind, the RE content of bundled power, co-firing of biomass per CERC methodology, and RE from non-obligated entities under gross/net metering counted to the area distribution licensee; hydro imported from outside India is excluded, while free power from hydro projects (except local area development contributions) is included (p2–3). Captive plants commissioned before 1 April 2016 keep the level fixed for FY 2015-16, newer ones take their year-of-commissioning level, and augmentation takes the augmentation year's level (p3). The Commission may revise targets (p3).
Regulation 4 lists the compliance routes, borrowing the menu from the Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2022 — own/captive generation, open access, requisition from the distribution licensee at a separately determined pooled-cost tariff, green hydrogen or green ammonia, certificates, or any other Central Government route — and requires quarterly/annual data reporting with a daily late fee for delay (p3–4).
Regulation 5 designates PEDA as State Agency, sets its verification protocol with SLDC/STU, quarterly publication of compliance statements, notices to defaulters, and annual reporting to the Commission (p4). Regulation 6 sets default consequences: a deposit equal to shortfall times the year's maximum power-exchange certificate clearance price within 90 days, MCLR-linked delay charges, no ARR pass-through for the distribution licensee, treatment as breach of licence/connectivity conditions, section 142 action, and transfer of receipts to the STU — with a discretionary carry-forward route where compliance is genuinely difficult (p5).
Regulations 7–12 repeal the 2011 Regulations with a savings clause and reserve the Commission's powers to direct, remove difficulties, amend and relax (p5–6).
Read with this
Commencement notices and reasons
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of PSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.