TNERC · Tamil Nadu Electricity Regulatory Commission

Amendment to regulation 3,11,27

RegulationDated 28 Feb 2011Published in the Gazette 23 Mar 2011

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a four-clause amendment by the Tamil Nadu Electricity Regulatory Commission (TNERC) to its 2009 framework regulations that govern how intra-state transmission and distribution tariffs are determined under a Multi-Year Tariff (MYT) approach. It is notified as TNERC/MYT/18/2 dated 28 February 2011 (p2) and printed in the Tamil Nadu Government Gazette of 23 March 2011 (p1); it takes effect on that publication date (p3). The Commission states it is amending the principal regulations on the recommendations of the Working Group Reports of the Forum of Regulators, to remove difficulties in making modifications that were not adequately covered earlier, and that the changes have undergone previous publication (p2).

Regulation 2 rewrites two items of Regulation 3 of the principal regulations, which sets out what an MYT filing must contain. Item (iv) is replaced by a new "Business Plan" clause: every licensee must submit a business plan and power purchase plan for the Commission's approval ahead of the MYT petition, the plan must project all activities including ongoing and new projects, loss reduction and effective tamper-proof metering, and must state the criteria used for the projections; the Commission must then pass an order on the plan within a set period so the licensee can file its MYT petition on the approved basis (pp3–4). Item (ix) is replaced by a new mechanism for sharing gains and losses from controllable factors: financial loss from failing to meet a controllable-cost target in any year of the control period is borne by the licensee, and efficiency gains on controllable parameters are shared between licensee and consumer in a stated ratio (p4).

Regulation 3 adds a paragraph to Regulation 11 requiring the distribution licensee to achieve supply-availability indices set by the Commission from time to time, with a reduction in Return on Equity for each shortfall in composite availability for urban and rural areas (p4).

Regulation 4 adds a paragraph at the end of Regulation 27 specifying that supply availability is to be measured on the power the distribution licensee has contracted on a long-term basis for the power procurement plan it submitted (p4).

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document