HERC · Haryana Electricity Regulatory Commission

Deviation Settlement Mechanism and related matters Regulations, 2025

Haryana Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2025

RegulationDated 27 May 2025Published in the Gazette 3 Jun 2025HERC/62/2025- dated The 27th May, 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Haryana Electricity Regulatory Commission issued these principal DSM regulations under notification No. HERC/62/2025 dated 27 May 2025, published in the Haryana Government Gazette on 3 June 2025 (p1). They replace the 2019 HERC DSM regulations and come into force four months after Gazette publication (p1, p11).

Regulations 2–7 set definitions, objective, applicability and scheduling. DSM applies to short-, medium- and long-term open access transactions using the intra-State transmission or distribution system, including inter-State wheeling. General sellers, including open access generators, captive generators and re-generators of 10 MW and above (excluding in-situ captive), and buyers including distribution licensees, deemed distribution licensees and full open access consumers are covered; wind and solar are routed to the 2019 HERC forecasting, scheduling and DSM regulations, and partial open access consumers to the 2012 open access regulations (p3–4). SLDC and state entities must follow IEGC and the Haryana Grid Code, register contracts, install interface meters and comply with SLDC despatch instructions (p4–5). The framework defines scheduling periods, weekly settlement, kWh/INR measurement and loss allocation (p5–6).

Regulations 8–12 are the commercial core. They cover gaming proceedings and disallowance of deviation charges (p5), computation of deviation for sellers and buyers (p5–6), and the normal rate of deviation charges, which is the highest of day-ahead ACP, real-time ACP or a blended formula including ancillary service charges (p6). Regulation 12 sets seller- and buyer-side deviation charge tables differentiated by frequency band, volume limit and technology: general sellers, run-of-river hydro, municipal solid waste stations, standalone energy storage, buyers, infirm power, start-up power and forced outages (p6–9).

Regulations 13–16 deal with State Energy Account preparation, the State Deviation Pool Account, payment timelines and letters of credit, and a State Power Committee (p9–11). Regulations 17–21 repeal the 2019 regulations with savings, and give the Commission powers to amend, remove difficulties, relax provisions and issue directions (p11). The regulation includes deviation-charge and buyer volume-limit tables in Regulation 12 (p6–8).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Scheduling and despatch

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.