CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2009 — Appendix IV: Transmission System Availability Factor Procedure

Procedure for Calculation of Transmission System Availability Factor for a Month

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is an Appendix-IV procedure that sets out how to calculate the monthly Transmission System Availability Factor (TAFM) for AC and HVDC transmission systems. It places the calculation with the transmission licensee, verification with the concerned RLDC, and certification with the Member-Secretary of the Regional Power Committee; results must be produced separately for AC and HVDC systems and grouped by sharing of transmission charges (p1).

TAFM is derived from a monthly non-availability factor. For AC systems, the procedure gives a weighted formula using outage hours, circuit length and sub-conductors for lines, MVA ratings for transformers/ICTs, and MVAR ratings for bus reactors, switchable line reactors or SVCs (p1–2). For HVDC systems, it uses a separate formula based on transmission capability reduction and rated capacity, treating HVDC terminals and directly associated EHV/HVDC lines as one integrated system (p2).

Clause 5 deems certain outages as available, including shutdowns for another transmission scheme and voltage-control switching or reactor tripping at RLDC direction, subject to RPC Member-Secretary discretion (p3). Clause 6 excludes force majeure and grid-incident outages from outage time, with onus on the licensee to prove force majeure and with restoration-time conditions after RLDC directions (p3). No issuance date, enabling provision or parent regulation is printed in the text.

Standard name
Tariff Regulations
Primary topics
Transmission availability and outages

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗