APERC · Andhra Pradesh Electricity Regulatory Commission

Transmission Licence Regulation, 2023 — Draft

Andhra Pradesh Electricity Regulatory Commission (APERC) Transmission Licence Regulation, 2023

Draft regulationDated 11 Oct 2023

Draft

A proposal that has since been finalised as the Transmission Licence Regulation, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The draft APERC Transmission Licence Regulation, 2023 is a principal regulation issued in draft by the Andhra Pradesh Electricity Regulatory Commission to consolidate the procedure for granting intra-state transmission licences and the general and special conditions attached to them. The preamble explains that the existing transmission licence was granted under the AP Electricity Reform Act, 1998 and that the APERC (Deemed Licence Conditions) Regulation, 2004 adopted the old licence conditions; the Commission now wants a separate regulation, especially for intra-state transmission developed through tariff-based competitive bidding under Section 63 (p1). It is made under Section 181 read with Sections 14–22 of the Electricity Act, 2003, and is dated 11.10.2023 (p1, p33).

Chapter 1 (p2) gives short title, extent and commencement. It applies to all transmission licensees in Andhra Pradesh, to applications pending on publication, and to licensees granted under the Reform Act; it comes into force on Gazette publication and supersedes earlier transmission-licence regulations, guidelines and directions. Chapter 2 (p2–5) defines key terms and sets interpretation and review provisions.

Chapter 3 (p5–17) is the procedural core: eligibility by reference to Ministry of Power RFP qualifications; application in Schedule I with fee and affidavit; filing, website publication and STU copy; receipt and acknowledgement; newspaper public notice; inspection; scrutiny; objections; STU recommendations; local inquiry; hearing and grant or refusal; deemed licensees; commencement; tenure; deposit of maps and copies; amendment; revocation; suspension and administrator appointment; and licence fees. It also sets outer timelines for some steps.

Chapter 4 (p17–32) sets licence conditions: system planning, open access, no undue preference, prior consent for mergers and transfers, other business, anti-competitive conduct, compliance, standards of performance, cooperation with STU/SLDC/RLDC, metering, state and transmission plans, capital investment, transfer of assets, business plan, protection of railways and telegraph lines, information and major-incident reporting, accounts, investigation, competition, ARR and tariff filing, deemed licensees, renewal and exemption. Chapter 5 (p32–33) contains miscellaneous powers: interpretation, specific conditions, dispensing with requirements, savings and repeals, removal of difficulties, relaxation, orders and practice directions, and amendment.

Schedules I–V (p34–45) provide the application form for grant, the application form for deemed licence, the affidavit, the form of public notice and the draft transmission licence format.

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions, Network planning and investment, Capital cost and investment

Read with this

The regulation

Procedures and orders made under it

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document