TNERC · Tamil Nadu Electricity Regulatory Commission
Consumer Grievance Redressal Forum and Electricity Ombudsman Regulations, 2004 — Amendment, 2014
Amendments to the Regulations for Consumer Grievance redressal Forum and Electricity Ombudsman
AmendmentDated 8 Sep 2014Published in the Gazette 22 Oct 2014Notification No.TNERC/CGRF & EO/6-10 dated 8-9-2014
Amends the Consumer Grievance Redressal Forum and Electricity Ombudsman Regulations, 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Tamil Nadu Electricity Regulatory Commission notification amending its 2004 Regulations for Consumer Grievance Redressal Forum and Electricity Ombudsman. It was issued on 8 September 2014 and takes effect from publication in the Tamil Nadu Government Gazette, printed here as 22 October 2014 (p1–2). It was made under s.42(5), (6) & (7) and s.181(2)(r) of the Electricity Act 2003, after prior publication of the draft as required by s.181(3) (p2).
All substantive changes sit in one short 'AMENDMENTS' block (p2–3). Regulation 7 is rewritten in three places: acknowledgement of a consumer grievance within a fixed number of working days, with anonymous grievances rejected on receipt and placed before the forum for record; the licensee's obligation to file para-wise remarks within a set period and the forum's power to proceed on the record if it does not, together with the complainant's right to appear in person or through a representative; and the enquiry procedure, requiring notice of date, time and venue to both sides and disposal of the complaint within a stated maximum period from receipt (p2). Four new sub-regulations are inserted after 7(11), creating a regime for interim orders by the Forum Chairman, barring disconnection of supply once an interim-relief petition is filed, and fixing registration and disposal timelines for interim applications, with a proviso tying interim relief in current-consumption-charge disputes to a deposit under s.56(1) (p2).
Two further changes: regulation 17(4)(a) is substituted to restate the pre-condition for approaching the Electricity Ombudsman — prior written representation to the forum, rejection, no reply within the stated period, or dissatisfaction — with a carve-out for common-nature complaints under 17(1) (p3); and a new regulation 22(7) makes non-compliance with Forum or Ombudsman orders attract proceedings under s.142 of the Act (p3). The notification is signed by the Commission's Secretary. Page 4 is an unrelated education-department notice and forms no part of the amendment.
Read with this
The regulation
Amendments and corrections
- Dated 3 Oct 2005Consumer Grievance Redressal Forum and Electricity Ombudsman (Amendment) Regulations 2005
- Dated 5 Nov 2009Consumer Grievance Redressal Forum and Electricity Ombudsman (Amending Regulations) 2009
- Dated 23 Nov 2011Consumer Grievance Redressal Forum and Electricity Ombudsman (Amending) Regulations, 2011
- Dated 22 Mar 2013Consumer Grievance Redressal Forum and Electricity Ombudsman Regulations, 2004 — Amendment, 2013
- Dated 2 Dec 2013CGRF and Ombudsman Regulations — Amendment (6-7)
- Dated 25 Feb 2014CGRF & EO Notification, 2013 — Errata, 2014
- Dated 18 Jun 2014CGRF and Electricity Ombudsman Regulations — Amendment, 2014
- Dated 29 Nov 2016Consumer Grievance Redressal Forum and Electricity Ombudsman Regulations, 2004 — Amendment, 2016
- Dated 6 Oct 2023Consumer Grievance Redressal Forum and Electricity Ombudsman Regulations, 2004 — Amendment, 2023
- Dated 28 Oct 2024CGRF & EO Regulations, 2004 — Errata, 2024
Consolidated copies, for reference (2)
Earlier drafts
- Dated 5 Nov 2009Consumer Grievance Redressal Forum and Electricity Ombudsman (Amending Regulations) 2009 — Draft
- Dated 16 Oct 2012Consumer Grievance Redressal Forum and Electricity Ombudsman (Amendment) Regulations, 2012 — Draft
- Dated 19 Mar 2014CGRF and Electricity Ombudsman Regulations, 2004 — Draft Amendment (Ombudsman Review), 2014
- Dated 27 Apr 2023Consumer Grievance Redressal Forum and Electricity Ombudsman Regulation, 2004 — Draft Amendment, 2023
10 more documents belong here and are not on Voltaic: 9 copies in another language and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.