AERC · Assam Electricity Regulatory Commission
Renewable Purchase Obligation and its Compliance Regulations, 2010
AERC (Renewable Purchase Obligation and its Compliance) Regulations, 2010
RegulationDated 2 Nov 2010No. AERC/21/2010 dated The 2nd November, 2010
4 amendments to it are on Voltaic, the latest dated 24 Feb 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Assam Electricity Regulatory Commission's principal instrument creating and enforcing a Renewable Purchase Obligation in the State, notified on 2 November 2010 as No. AERC/21/2010 and made under sections 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003 (p1). It applies throughout Assam and binds 'obligated entities' — distribution licensees, consumers owning captive plants and open access consumers in the State (p2–3).
Regulation 4 sets an escalating annual RPO as a share of each obligated entity's total energy handled, running from 2010-11 to 2014-15 and reviewable by the Commission, with a solar carve-out that starts at a small fraction of the obligation and steps up each year (p3). Existing renewable PPAs already consented to continue for their validity even if they overshoot the obligation.
Regulations 5 and 6 make CERC-issued Renewable Energy Certificates the compliance instrument, require solar and non-solar obligations to be met with matching certificates, provide for deposit of certificates with the Commission, and provide for a designated State Agency to accredit projects, recommend registration, report quarterly on compliance and be remunerated (p3–4).
Regulation 7 handles default: a separate fund sized on the shortfall and the CERC forbearance price, deposit within 15 days or breach of licence conditions, penalty under section 142, and a carry-forward route where certificates are genuinely unavailable (p4–5). Regulation 8 allows appointment of Compliance Auditors; Regulation 9 gives the regulations overriding effect over three earlier AERC regulations; Regulations 10–14 cover removal of difficulties, practice directions, inherent powers, amendment and final interpretation by the Commission (p5–6).
Read with this
Amendments and corrections
- Dated 15 Oct 2015Renewable Purchase Obligation and its Compliance Regulations, 2010 — Amendment, 2015
- Dated 14 Mar 2017Renewable Purchase Obligation and its Compliance Regulations, 2010 — Second Amendment, 2017
- Dated 4 Apr 2022RPO Regulations, 2010 — Third Amendment, 2021
- Dated 24 Feb 2025RPO Regulations, 2010 — Fourth Amendment, 2024
Commencement notices and reasons
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.