Intra-State Transmission System Planning, Coordination, Development and Approval Regulations, 2019

Jharkhand State Electricity Regulatory Commission (Planning, Coordination, Development and Approval of an economical and efficient Intra-State Transmission System) Regulations, 2019

RegulationDated 4 Oct 2019Published in the Gazette 10 Oct 2019Notification No. 72 dated 4th October, 2019

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is JSERC's principal regulation setting out how the intra-state transmission system in Jharkhand is to be planned, coordinated, developed and approved. The Commission's stated rationale (p1–2) is that investments in intra-state transmission are ultimately recovered through tariff and are shared among multiple licensees and generating companies, so a transparent, economical, coordinated and consultative planning process is needed; the existing State Grid Code's investment-approval route assumes the incumbent Transmission Licensee will execute projects, whereas future projects may instead be awarded through tariff-based competitive bidding under Section 63.

Chapter I (p1–2) gives the short title, commencement (from Gazette publication), territorial extent (whole State of Jharkhand) and definitions — Act, Commission, Grid Coordination Committee, Licence/Licensee, Petition, Project, RPO, Secretary, State Grid Code, Transmission Charges and Transmission Licensee. Chapter II (p3–4) sets the objective and scope: the regulations apply to STU, SLDC, Transmission Licensees, Distribution Licensees, Generating Companies including Captive Generating stations, Open Access consumers, the GCC and other recognised entities; they sit alongside the State Grid Code and other JSERC regulations and require STU schemes to be approved by the GCC and the Commission before execution. It then assigns roles: STU plans and runs system studies, SLDC supplies operational statistics, generators and open-access consumers submit technical data and project status, distribution licensees give load-growth studies, ongoing downstream projects and planned new networks, transmission licensees give ongoing and planned transmission projects, STU shares the signed-off plan with CEA/RPC for feedback within three months.

Chapter III (p5–8) is the operative core. It lists what STU must weigh when strengthening or upgrading the system (new technologies, cost-benefit, retirements, renewable additions and RPO, black start, reactive power, inter-state and CEA plans, government policy, etc.) and how renewable-driven augmentation is to be planned. It lays down the planning process step by step: a rolling five-year plan updated annually; specified input sources and submission timelines; probabilistic studies across seasons and load/renewal scenarios; options for upgrading rather than building new; mid-course corrections; website publication of scenarios and schemes with a stakeholder comment window; finalisation timelines; GCC review and joint sign-off; escalation of deadlock to the Commission for a regulatory direction; and onward submission to CEA/RPC. It then covers stakeholder consultation and transparency, the five-year and annual plan finalisation, the regulatory filing package STU must place before the Commission (with an exception where projects are funded exclusively by State or Central government grants), manpower deployment, STU as custodian of base-case and study files with quarterly status reporting, and standard clauses on power to amend, power to remove difficulties, and inherent powers of the Commission.

Primary topics
Network planning and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.