TNERC · Tamil Nadu Electricity Regulatory Commission
Intra-State Transmission Tariff Regulations, 2026 — Draft
Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Intra-State Transmission System) Regulations, 2026
Draft regulationDated 31 May 2026TNERC/TR/2026/....... dated xx-xx-xxxx
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft TNERC regulation published for public comment, with objections or suggestions invited by 15-06-2026 (p1, p4). It sets a five-year multi-year tariff framework for intra-State transmission for FY 2027-28 to FY 2031-32. It is to commence on publication in the Tamil Nadu Government Gazette and remain in force until 31 March 2032 unless reviewed or extended (p5). It applies to existing and future Transmission Licensees, including the State Transmission Utility, and also to TBCB Transmission Licensees and dedicated transmission lines where consistent with their Transmission Service Agreements and central TBCB guidelines, and to Users of the intra-State transmission system (p5-7).
Chapter 1 contains the short title, commencement, supersession and extent, and an extensive definitions clause covering tariff, TBCB, availability, cost pools and related terms (p5-16). Chapter 2 sets the MYT process: the initial MYT petition, the Mid-Term Review and the later true-up/APR cycle, including treatment of gains and losses from controllable and uncontrollable factors (p17-27).
Chapter 3 is the cost-plus ARR chapter. It specifies the ARR building blocks and the treatment of capital investment plans, capital base, IDC/IEDC, additional capitalisation, debt-equity, return on equity, tax, interest on loan, depreciation, O&M, working capital, other costs, non-tariff income, rebates and carrying cost (p28-51). It also excludes BESS capital expenditure from transmission project cost and cross-refers BESS costs to the separate TNERC BESS Regulations, 2026 (p33-34, p48-49).
Chapter 4 brings TBCB projects into the framework by treating their adopted Annual Transmission Service Charges as a separate line item, with limited grounds for reopening (p52-53). Chapter 5 defines Total Transmission Cost as the Section 62 ARR plus TBCB ATSC plus approved adjustments, and sets out revision triggers (p54-57). Chapter 6 provides for sharing transmission charges through Allocated Capacity, cost pools, pooling methodology and special open-access and exemption provisions (p58-64).
Chapter 7 assigns billing, collection, settlement and disbursement to the STU or a designated nodal agency, with monthly billing, late-payment provisions and a procedure to be approved by the Commission (p65-67). Chapter 8 sets operational norms for transmission loss, target availability, auxiliary consumption and the monthly transmission charge formula, including availability-linked incentives (p68-70). Chapter 9 contains miscellaneous powers, relaxation, dispute resolution and savings (p71-74).
Annexure 1 contains the depreciation schedule; Annexure 2 the availability certification procedure; Annexure 3 the availability formulae for transmission elements (p75-82). The tariff formats section contains the MYT, true-up and APR forms, including separate reporting for Section 62 and TBCB revenue (p83-161). The Statement of Reasons explains the need for the standalone framework and its salient features, citing TBCB integration, national policy alignment and renewable-led network expansion as drivers (p162-167).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.