NERC · Nagaland Electricity Regulatory Commission
Citizens Charter Regulations, 2012
Nagaland Electricity Regulatory Commission (Citizens Charter) Regulations, 2012.
RegulationDated 5 Nov 2012NO.NERC/REGN/2012(A) dated 5 th Nov., 2012
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Nagaland Electricity Regulatory Commission's Citizens Charter — a notification (No. NERC/REGN/2012(A), dated Kohima 5 November 2012) framing the responsibilities, duties and obligations of each stakeholder in the power sector "in the interest of all citizens" (p1). It is made under Section 181(2)(zp) of the Electricity Act 2003 and extends to the whole State of Nagaland; it comes into force from the date of publication in the Nagaland Official Gazette, which is not printed in this text (p2).
The Charter is structured as a short statement of mutual commitments rather than a code of technical standards. Its preamble (p1) explains the concept: a pledge of trust among three stakeholders — the consumer, the utility/service provider and the Commission — aimed at quality power at reasonable price. Regulation 4 (p3) lists the Commission's reasons for issuing it: strengthening public and consumer-organisation relations, educating the public on paying for electricity and on the regulations governing suppliers and on the regulator's role and the grievance redressal system, providing direct interface, bridging the information gap, and raising consumer awareness of rights and responsibilities.
Regulation 5 (p3–5) sets out consumer rights — reliable and safe power, clear and complete billing information, accurate and timely bills, access to service and complaint information, advance notice of temporary termination, fair and expeditious grievance redressal, equal treatment and confidentiality — and consumer responsibilities, including prompt full payment, security deposits, observing contract and tariff-category terms, permitting authorised utility personnel entry, giving notice on change of residence, avoiding illegal connections or meter tampering, cooperation with the service provider, energy saving and use of efficient appliances.
Regulation 6 (p5–6) records the licensee's obligations: reliable and safe supply, timely accurate bills, fault rectification, consumer education on energy conservation and demand-side management, pro-active complaint handling, advance notice of planned outages and awareness of the grievance redressal system. Regulation 7 (p6) states the regulator's role — regulating energy services, monitoring utility performance, receiving and investigating complaints, balancing consumer needs against availability, educating consumers, taking punitive action against erring providers and sharing views on technological innovation. Regulation 8 (p6–7) anchors the Charter to the Electricity Act 2003, the Indian Electricity Rules 1956 and three NERC Regulations of 2012 (grievance redressal/ombudsman, supply code and standards of performance). It is signed by the Deputy Director-cum-Commission Secretary (p7).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.