Skip to content

BERC · Bihar Electricity Regulatory Commission

Multi Year Distribution Tariff Regulations, 2024 — Draft

Bihar Electricity Regulatory Commission (Multi Year Distribution Tariff) Regulations, 2024

Public notice on a draftDated 6 Aug 2024

Draft

The draft has since been finalised as the Multi Year Distribution Tariff Regulations, 2024.

Public notice on a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft Bihar Electricity Regulatory Commission (Multi Year Distribution Tariff) Regulations, 2024, issued by BERC under the Electricity Act, 2003 for determining distribution tariffs in Bihar on a multi-year framework (p1). It applies to all distribution licensees in Bihar and is intended to govern cost-based/ARR-based tariff determination from 1 April 2025 up to FY 2027-28, with a control period of three years from 1 April 2025 to 31 March 2028 unless extended (p1–3). The regulations come into force from the date of notification in the Official Gazette (p1).

Part I (pp1–6) sets the title, commencement, extent, scope and definitions. Part II (pp6–13) establishes the MYT framework: business plan, forecast, performance trajectories, annual review and true-up, and the pass-through/sharing treatment of controllable and uncontrollable factors. Part III (pp13–18) lays down the procedure for tariff applications, public notice, tariff orders, true-up and annual performance review, and consequences of non-filing. Part IV (pp19–29) deals with sales forecasting for metered and unmetered consumers, agricultural feeder studies, AT&C loss computation and formula, power purchase quantum and cost, and the monthly Fuel and Power Purchase Adjustment Surcharge mechanism. Part V (pp30–44) specifies the components of ARR and financial principles: O&M norms, depreciation, contingency reserve, loans and finance charges, interest on working capital, return on equity, tax gross-up, non-tariff income, income from other business, regulatory assets and late payment surcharge. Part VI (pp44–53) covers segregation of wheeling and retail supply business, target availability and incentive/disincentive, subsidy treatment, cross-subsidy and cost-to-serve allocation, tariff design including time-of-day tariffs and open access surcharges. Part VII (pp53–54) contains amendment, removal of difficulties, variation and repeal/savings provisions, repealing the 2021 MYT regulations while preserving prior-period proceedings. The remainder (pp55–112) contains prescribed tariff petition formats (FORMAT-1 to FORMAT-41) covering sales, power purchase, expenses, capital investment, loans, ARR, revenue, cross-subsidy and other filings.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document