HPERC · Himachal Pradesh Electricity Regulatory Commission

Renewable Power Purchase Obligation and its Compliance Regulations, 2023

Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) Regulations, 2023

RegulationDated 24 Feb 2023No. HPERC/438 dated 24th February, 2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission issued these Regulations on 24 February 2023 to replace the state's 2010 renewable purchase obligation framework with a renewable power purchase obligation (RPPO) regime tied to the CERC renewable energy certificate (REC) framework and to a multi-year obligation trajectory running to 2030 (p1, p12, p16). They come into force on publication in the Himachal Pradesh Rajpatra; the Gazette date is not printed (p1).

Regulation 3 fixes who is obligated — the distribution licensee, anyone consuming conventional power through open access or otherwise, and captive plants above specified capacity thresholds depending on whether the plant serves standby or normal consumption — and exempts waste-heat-recovery cogeneration and retail consumers of the licensee in that capacity (p3). Regulation 4 sets out how the obligation quantum is derived, how an obligated entity's consumption is computed (purchases, own generation net of auxiliary consumption, T&D losses, exclusions for sales, banking), how conventional supply is presumed unless RE origin is established, and the Commission's power to revise targets or allow inter-category adjustment (p3–5).

Regulation 5 specifies the means of fulfilment — RE purchases, own RE generation, free/royalty power, banking, redeemed certificates, green hydrogen or green ammonia, green-energy open access procurement, and rooftop solar net/group metering — the treatment of sold energy and REC-mechanism purchases, and how shortfalls may be carried forward or offset across categories using certificate multipliers (p5–7). Regulation 6 makes CERC-issued certificates the instrument of compliance and puts accreditation safeguards in place against double counting (p7–8).

Regulations 7 and 8 designate the Directorate of Energy as State Agency, require it to build and operate an RPPO web-portal with procedures, to report quarterly and annually to the Commission, and to verify obligated-entity data; obligated entities must register online and file quarterly and annual returns in stated timelines (p8–10). Regulation 9 provides for a default fund used for certificate purchase and RE evacuation infrastructure, and for penalties under s.142 with a carry-forward escape (p10–11). Regulation 10 defines purchases under the REC mechanism and lets the Commission fix the APPC rate for them (p11). Regulations 11 to 16 give the Regulations overriding effect over tariff and open-access regulations, allow directions to remove difficulties, save the Commission's inherent powers, repeal the 2010 Regulations with savings, and reserve interpretation to the Commission (p11–12). The Schedule carries the minimum RPPO percentages by year and category, the energy storage obligation, cross-category adjustment rules and a worked illustration (p13–16).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Energy storage obligation

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.