Sharing of Revenue from Utilisation of Transmission Assets for Other Business Regulations, 2007

Central Electricity Regulatory Commission (Sharing of revenue derived from utilisation of transmission assets for other business) Regulations, 2007

Regulation · Gazette copyDated 27 Dec 2007Published in the Gazette 31 Dec 2007In force from 1 Jan 2008F. No. L-7/106(122)/CERC-2007. dated 27th December, 2007

Replaced by Sharing of Revenue Derived from Utilization of Transmission Assets for Other Business Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Sharing of Revenue from Utilisation of Transmission Assets for Other Business Regulations, 2007.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or purported to have been done under the repealed regulations shall be deemed to have been done or purported to have been done under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A CERC principal regulation issued on 27 December 2007 and gazetted 31 December 2007 (p1, p5), making owners of the inter-State transmission system share with beneficiaries any revenue they earn by putting transmission assets to non-transmission use. It applies to transmission owners whose transmission charges the Commission determines on a cost-plus basis and takes effect on 1 January 2008 (p5).

Regulation 3 requires prior written intimation to the Commission before starting any "other business", backed by an affidavit covering the nature of the business, capital invested, revenue derived or estimated, assets used, asset cost and any impact on inter-State transmission. Owners already in such business at commencement had two months to report; details must be re-filed on every change of use, half-yearly for telecommunication business and annually otherwise, and must also be given to the beneficiaries of the assets used (p6).

Regulation 4 sets the sharing mechanism. For telecommunication business the criterion is the length of right-of-way used for optical fibre cable or OPGW on the owner's towers, shared at Rs.3000 per year per km, apportionable among users in proportion to the fibres identified for use; an Explanation gives the pro-rata formula where only some fibres are used for telecom (the rest being for the Unified Load Despatch and Communication scheme), and half-year reference dates of 1 April and 1 October apply, with right-of-way as on 1 January 2008 for the transitional quarter. For any other business the Commission decides sharing case by case, after hearing the owner and the beneficiaries (p6–7).

Regulation 5 requires the shared revenue to be passed through as a reduction of transmission charges in proportion to what each beneficiary pays, adjusted monthly in bills (p7). Regulations 6–8 require separate books for each other business with annual audited submissions, bar the transmission business from subsidising or encumbering assets for the other business, and give the Commission inspection, verification and order-making powers (p7–8). Regulations 9–11 cover directions, removal of difficulties and the conduct of proceedings (p8).

Standard name
Other Business Income
Primary topics
Operating costs and other income, Business separation and other business, Transmission tariff

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.