Grid Interactive Distributed Renewable Energy Sources (Second Amendment) Regulations, 2023

Chhattisgarh State Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) (Second Amendment) Regulations, 2023

AmendmentDated 6 Oct 2023In force from 1 Sep 2023No. 106/CSERC/2023 dated 6th October 2023

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CSERC's second amendment to its 2019 Grid Interactive Distributed Renewable Energy Sources (DRE) Regulations, issued at Raipur on 6 October 2023 as Notification No. 106/CSERC/2023 (p8). It is made under sections 42, 61, 66, 86 and 181 of the Electricity Act 2003, and although notified in October it states it comes into force from 1 September 2023 (p9).

It first adds two definitions to regulation 2 — "Banking Cycle", tied to the financial year, and "Green energy", which covers renewable generation including hydro and storage using renewable energy, and mechanisms replacing fossil fuels such as green hydrogen or green ammonia, cross-referring to the Green Energy Open Access Rules 2022 (p9). Regulation 7 gains a duty on the distribution licensee to issue yearly green certificates for green energy supplied on request beyond the recipient's RPO, and a new sub-regulation 7.4 giving consumers at or above a stated contract-demand/sanctioned-load threshold the option to requisition green energy from the licensee, with exemptions from dedicated feeders and RTU/ABT metering for small solar plants and a higher size allowance for KUSUM plants (p9).

Regulation 6 replaces the first proviso to regulation 18.2(a), resetting the minimum and maximum sizes of distributed renewable energy systems that may wheel or transmit to captive or open-access load, and splits the regime between projects within the first 500 MW or achieving COD by a cut-off date and "upcoming" IDRES projects (p10). Regulation 7 substitutes regulation 21 wholesale, laying out the open-access charge heads — transmission, wheeling, cross-subsidy, fees and charges, standby, banking and deviation — with a two-column table running across pp10–12, and adds monitoring, applicability and savings-style clauses 21.9–21.11 (p12).

Primary topics
Open access, Open access charges, Green energy open access

Read with this

Voltaic does not hold the regulation itself.

No other documents to read with it are on Voltaic.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.