CERC · Central Electricity Regulatory Commission
Thermal Tariff Filing Forms for Determination of Tariff — Part-I, Annexure-I
TARIFF FILING FORMS (THERMAL) FOR DETERMINATION OF TARIFF PART-I Annexure-I
RegulationDate not stated
Summary
Summary written by software. Check the regulator's original before you rely on it.
This document is Part-I, Annexure-I of the tariff filing forms for thermal generating stations, issued for tariff determination. It is not a tariff order or a substantive regulation; it is a forms-and-checklist package that tells a generating company what schedules, statements, notes and supporting documents must accompany a thermal tariff petition.
The cover checklist (pp1–4) lists forms from Form-1 to Form-19 and supporting information/documents, including audited station and corporate accounts, loan agreements, equity agreements, BPSA/PPA copies, DPR, CPM/PERT charts, cost-and-time-overrun justification and electronic copies in Word/Excel (p4). The first actual form is the Summary Sheet (p5), which collects yearly cost and energy-charge items for 2013-14 through 2018-19 and notes that the energy charge rate for the month is based on fuel cost and GCV as per Regulation 30(6). Form-1(I)/(II) (p6) cover claimed capital cost and return on equity. Plant Characteristics (pp7–8) captures unit-wise technical design data and fuel details, with terms referenced to the CEA Technical Standards for Construction of Electric Plants and Electric Lines Regulations – 2010. Normative parameters for tariff computations (p9) set out what is to be declared, including target availability, auxiliary energy consumption, gross station heat rate, specific fuel oil consumption, O&M, working-capital periods; effective tax rate is to be computed under Regulation 25.
Later forms deal with foreign loans and foreign equity (pp10–12), abstract and break-up of capital cost for existing and new coal/lignite and gas/liquid fuel projects (pp13–28), variables and optional packages for new projects (p29), cost overrun, time overrun and additional RoE claim forms (pp30–37), financial package up to COD and project/corporate loan allocation (pp38–43), additional capitalisation and de-capitalisation statements (pp44–49), capital cost and CWIP statements (pp50–53), financing of additional capitalisation (p54), depreciation calculation and statement (pp55–56), weighted average interest on actual loans, normative loan interest and working capital interest (pp57–60), other income, IEDC and package expenditure (pp61–63), draw-down schedule for IDC and financing charges (pp64–67), actual cash expenditure (p68), fuel and limestone details for energy charge computation, capital spares and liability flow (pp69–74). The forms repeatedly require year-wise data, COD-wise and true-up data, auditor certification and quantified justification for cost/time overruns and additional capitalisation. The stated tariff period is 2014-19, with final true-up in 2019-20 (p4), and depreciation schedules run up to 31.03.19 (p55).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.