WBERC · West Bengal Electricity Regulatory Commission
National Load Despatch Centre Rules, 2004
RulesDated 2 Mar 2005G.S.R. 158(E) dated the 2nd March, 2005
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Ministry of Power notification G.S.R. 158(E) dated 2 March 2005 makes the National Load Despatch Centre Rules, 2004 under section 176(2)(d) of the Electricity Act, 2003 (p1). Rule 1 gives the short title and ties commencement to publication in the Official Gazette (p1). Rule 2 adopts the Act's definitions (p1). Rule 3 constitutes a national-level National Load Despatch Centre for optimum scheduling and despatch among Regional Load Despatch Centres and makes it the apex body for integrated operation of the national power system (p1). It then lists NLDC functions: supervising RLDCs; scheduling and despatching over inter-regional links in line with grid standards and the Central Commission's grid code; coordinating with RLDCs and Regional Power Committees on economy, outage scheduling, energy accounting and restoration; monitoring grid security; controlling inter-regional links; coordinating trans-national exchange; giving planning feedback to the Authority and CTU; levying and collecting fees and charges as specified by the Central Commission; and disseminating operational information per CERC and Central Government directions (p1–2). It sets no detailed procedures or values, leaving standards, grid code and fees to later specification.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.