MSERC · Meghalaya State Electricity Regulatory Commission
Intra-State Essential Reliability Services Operations Regulations, 2020
Meghalaya State Electricity Regulatory Commission (Intra-State Essential Reliability Services Operations) Regulations, 2020
RegulationDated 31 Jul 2020MSERC/REGULATIONS/ERS/2020/01 dated 31-07-2020
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Meghalaya State Electricity Regulatory Commission's (Intra-State Essential Reliability Services Operations) Regulations, 2020 — notification MSERC/REGULATIONS/ERS/2020/01 dated 31 July 2020 (p1) — establish an in-state ancillary services mechanism run by the State Load Despatch Centre. They are made under ss. 42, 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003, extend to the whole of Meghalaya, and take effect from Gazette notification (p1, p3).
Regulations 1–2 give title, commencement, extent and the working vocabulary: ERS, Regulation Up and Regulation Down service, ERS Provider, Nodal Agency, Virtual Ancillary Entity, un-requisitioned surplus, deviation, congestion, time-block, SCED and SCUC (p1–3). Regulation 3 states the objective — balancing state supply and demand, relieving intra-state transmission congestion and optimising despatch with reserves — and Regulation 4 confines application to intra-state entities in short-, medium- and long-term access transactions, expressly excluding hydro and renewable generators (p3). Regulation 5 makes MePGCL stations whose tariff the Commission determines or adopts mandatory ERS providers, and allows other state stations to be considered at a stated consolidated tariff (p3).
Regulation 7 gives the Nodal Agency (the MePTCL Load Despatch Centre) its role: merit-order stacks of un-requisitioned surplus for Regulation Up (lowest to highest variable cost) and a reverse stack for Regulation Down, adjusted for transmission constraints, and direction of providers when defined trigger events occur — weather, unit or line outages, frequency trends, loop-flow congestion and similar (p4). Regulation 8 lists the monthly technical and cost data each provider must file and its duty to follow despatch instructions (p4–5). Regulations 9–11 cover triggering, withdrawal, scheduling through the Virtual Ancillary Entity, and a separate ERS statement kept alongside the state deviation settlement account (p5–6).
Regulations 12–13 provide weekly energy accounting with an Ancillary Services Statement, and settlement through the State Deviation Settlement Pool under a separate ERS head, distinguishing revenue-neutral (zero balance) from non-zero balance pools, paying Regulation Up at variable charges on a non-retrospective basis and clawing back variable charges for Regulation Down (p6). Penalties for sustained failure or gaming and for disobeying directions, and the absence of commitment charges, are also set (p6). Regulation 14 (p7) defers operational detail to a Detailed Procedure to be issued by the Nodal Agency within three months with Commission approval; Regulations 15–18 give the Commission powers to direct, relax, amend and remove difficulties (p7).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.